• Login

Precision Configuration and Strategic Business Information Architecture

Radically increase the strategic and operational business decision support value delivered by your Integrated Business Information System (IBIS = ERP+) installation by developing a comprehensive precision logical model of your business in the configuration with particular focus on the "Strategic Business Information Architecture" -- the content that defines the business ranging from the Item Class / Product Class / Materials Group through to the Chart of Accounts and ALL other attribute and classification tables in between within the context of a fully integrated business systems CONTENT design


<<< PREVIOUS SECTION:  The Business Simulation Laboratory

NEXT SECTION:  Custom Strategic Software Design and Oversight of Construction >>>

NEXT SUB-SECTION:  Precision Configuration based on Strategic Engineered Precision Taxonomies >>>



Related Pages:

Precision Configuration based on Strategic Engineered Precision Taxonomies

The JAR&A Cubic Business Model

Highly Structured Strategic Chart of Accounts -- a Vital Element of your Corporate Information Arsenal

The Product Catalogue -- an Essential Element of any Precision Configuration

Attributes -- answers to the questions you have NOT yet thought to ask

Case Studies of Notably Successful Projects with high value Precision Configuration

092 Doing things differently and better -- ASCO Case Study 2-- BPM Summit 2013

088 Strategic ERP Invesment -- ASCO Case Study -- Service Management Conference and Exhibition Africa

026 Information Architecture and Design of FIS for Rennies Group -- Financial Information Systems Conf

018 CRM Risk Control: Designing and Implementing an Integrated Risk Mgmt Sys -- Integrated Risk Mgmt Conf

011 V3 Consulting Eng: Benefits of MIS to Professional Practice -- SAICE 15th Ann Conf on Computers in Civil Eng

Strategically Enriching your Business Information Systems

Part 1 -- Introduction

Part 2 -- Principles of Data Engineering

Part 3 -- Steps in applying these recommendations

Simple Steps to increase the strategic information value yield from your Business Systems Investment

The Full JAR&A Taxonomy Manual

Part 1: Introduction, Problem Statement, Definitions and Examples

Part 2: Why Use JAR&A, Required Knowledge and Experience, Cubic Business Model and Chart of Accounts and Taxonomy Software

Part 3: How to do it, Case Studies and White Papers and other References

Example General Ledger Manual

Business Process -- Irrelevant, Distracting and Dangerous

The RIGHT Approach

Precision Configuration based on Strategic Engineered Precision Taxonomies

In understanding what was required for precision, reliable, sustainable HIGH VALUE ERP operation James very early on applied taxonomies to his work and configured the software to very high standards of precision

This was a reflection of experience he had gained throughout his career with regard to precision in engineering and classifications of animals at school, classification of the results of his PhD research and classification of documents in the Military Filing System -- all of this came together with his first ERP and business information system projects and delivered exceptional results

For many years James did not recognize the importance of taxonomies because he assumed that everybody understood their significance and applied them and also because he did not fully recognize the extent to which taxonomies had contributed to some of his early success stories which were characterized by exceptional quantities of management information and dramatically reduced operating costs including reduction in audit time and cost

In the last few years James has become increasingly aware that it seems that few people, if any, have understood the importance of ERP and BI Taxonomies at the level of precision and rigour that he has developed and that this lack of taxonomies and precision is giving rise to MASSIVELY sub-optimal ERP operation in particular and IT investments in general

It has taken several years to unpack what is in James' head to a point that he is now starting to teach others and has written a Taxonomy Handbook of over 200 pages detailing his understanding

Part of the Taxonomy Handbook is available to download off the Box on the LinkedIn profile at http://za.linkedin.com/in/drjamesarobertsonerpdoctor and the full handbook can be obtained by emailing us

We are certain that Strategic Engineered Precision Taxonomies (SEPT) and Precision Configuration are the single biggest opportunity in the business information space, not only in ERP's but also in Data Warehouses and Business Intelligence environments as well as in CRM and other information areas -- watch this space for more information or contact James

More information relating to Precision Configuration and Taxonomies is contained in the webpages under this one

The ASCO Case Study below gives an indication of the sort of substantial benefit that can be achieved by applying Dr James Robertson's methods

Doing things differently and better -- ASCO Case Study – Creating Competitive Advantage -- by Robert Priebatsch and Dr James Robertson

1.   Overview of the business – marketing and brand management

African Sales Company is a moderate sized family owned business that imports and distributes fragrances, perfumes and related products.  They also provide a brand management service to their suppliers and distribute fine fragrances and luxury cosmetic brands like Dior, Givenchy, Gucci, Dolce and Gabbana, Paco Rabanne, Carolina Herrera, Prada, Calvin Klein, Hugo Boss and others to retail vendors like Edgars, Foschini, Truworths, Stuttafords, Woolworths, Dis-Chem and others.  ASCO does this with prescribed service levels aiming at 98% fill rates and three day delivery times from receipt of EDI orders to goods being available at retail points.


          

In order to understand the business it is vital to understand the close juxtaposition of brand management and distribution.


2.   The challenge – overview of the situation before the investment

The challenge that gave rise to this project was an old customized software suite that had grown with the business on a tight budget.  The accounting with regard to brand related costs was handled by more than 20,000 accounts in the General Ledger.  Other aspects of Brand Management were manual.  Tracking costs and reporting on many brands to multiple Suppliers was a major challenge.


3.   The opportunity – implementing a new ERP and Warehouse System taking a strategic view

A point was reached where a new system was required and an integrated suite of ERP and Warehouse Management System was purchased.  Initially a comprehensive workflow (process) analysis was undertaken but the project stalled.  The project was then restarted with a strong strategic and precision configuration focus with tight project management and successfully brought to completion – the process maps were left on the shelf.

During the project it was identified that areas of the business that would benefit from a new approach – particularly relating to brand management expense allocation and a custom solution was conceptualized, designed, built and implemented in order to maximize the effectiveness of brand management.


4.   The solution – highly structured Product Class, integration with Projects Module, custom software

The total strategic solution comprised:

a. The Brand Hierarchy – a highly structured Product Classification of all products linking from Suppliers down to individual Brand Lines – this created a high value logical information platform that underpins every aspect of brand and business management;

b. A selection of fundamental highly structured custom product attributes that have opened up diverse strategic intelligence and analytical opportunities;

c. Intelligent Product Master maintenance that draws on the intelligence in the Brand Hierarchy and attribute lists to ensure that default values are cascaded down the hierarchy so that new product take-on generates high quality intelligent data that impacts every aspect of system operation and management information;

d. Rule based automated creation of Marketing projects linked directly to the brand hierarchy coupled to a highly structured cost taxonomy provided a comprehensive framework for Brand Management information.  This custom functionality, based on knowledge of the codes, opens the door for convenient and powerful marketing planning, cost analysis and reporting;

e. All of these components taken together have created a holistic and integrated intelligent information platform that has resulted in the business now having a much stronger analytical focus, capability and culture.


5.   The outcome – greatly improved brand management and other capabilities supporting profitable growth and competitiveness

Taken together this capability improved expense allocation accuracy, allowed detailed ROI analyses, increased competitiveness through informed allocation of resources, facilitated growth and stimulated profitability in significant measure through the investment in strategic precision configuration and associated custom development.  This capability assisted ASCO to grow significantly, take on new accounts and reach a point where a new distribution centre became a business necessity such that a new warehouse is currently in the design phase.

Associated with this capability has been the development of a highly analytical culture which has positioned ASCO as an industry leader in the management of information and therefore Brand Management in its specialized category.

It should be noted that as a consequence of the development of these capabilities there have been further changes to practices and ways of working (processes) which have flowed organically from the original analysis and decision making capabilities.

 

Contact James@James-A-Robertson-and-Associates.com to find out how we can assist your enterprise to obtain this sort of outcome

The Relative Value of Precision Configuration versus Traditional Configuration


091 - Business Process -- Over Rated and Over Stated

Discussion of why the current focus on Business Process Mapping is seriously misplaced and is leading to major inefficiencies and negative project outcomes in the business information systems industry -- concludes that "Business Process Obsession is killing ERP"

 

 

Business Process – over rated and over stated NOT the real opportunity

 

By 

Dr James Robertson PrEng

 

 

 

In recent years we have been barraged with talk about "business process" and business process is touted in ways that suggest that it is the most important thing in ERP implementations

 

Many years ago the systems we now call "ERP" were called "Management Information Systems" yet today that is not a frequently used term

 

Why?

 

Well firstly, because Management Information frequently does not happen, a survey by Gartner a few years ago suggested that "most organizations are not making better decisions than they did five years ago".  In my own experience executives are frustrated because they cannot get the management information they need from their massively costly investments in ERP, BI, etc.  Recently the CEO of a very large corporation in Johannesburg rated his executive information systems at 3 out of 10 (0 = non-existent) and told me he would rate them at 1 out of 10 if it were not for the fact that he had excellent staff who provided him with the information he needed.

 

Examination of his big brand ERP revealed that it was configured in such a way that electronic summarization of key measurements was technically impossible and that human intervention was unavoidable.  His dilemma is widespread and was summed up by the Financial Mail some years ago when they reported "19 out of 20 ERP implementations do NOT deliver what was promised".

 

Then, of course, there is the dilemma of other surveys that report high levels of satisfaction with ERP – why?

 

The bottom line is simple – if you put in an ERP expecting it to improve management and executive information and decision support you have almost certainly been frustrated and disappointed BUT, if  you put it in to manage workflows you may well be reasonably satisfied, even if it has cost much more than expected.

 

BUT there is a challenge here

 

Some years ago I was taken to task by a client who insisted on putting process before executive information and who insisted on speaking about "the strategic process" – when I tried to point out the points above it was to no avail.

 

If we take the word "process" to be synonymous with "workflow" then there is NO such thing as the "strategic process" – unless discussions and decisions are to be classed as workflow.

 

The REAL problem facing business today is to get value out of their massive ERP and BI investments in a way that supports high value decision making.

 

This is entirely achievable, a method that I term "Strategic Engineered Precision Taxonomies" (SEPT) leading to "Precision Configuration" opens the door to major overhauls of your ERP, Data Warehouse or Business Intelligence investment in order to support high value decision support information delivery.

 

This is by far the biggest opportunity facing business today in the information technology space and I will be talking more about this in my presentation to the BPM Summit with examples of what causes the problem and what is required to fix it.

 

091 Business Process - Over Rated and Over Stated -- by Dr James A Robertson PrEng from James Robertson

 

Download Business Process -- Over Rated and Over Stated -- Presentation in Power Point pptx format

 

Download Business Process -- Over Rated and Over Stated -- Slides in Adobe pdf format

Download Business Process -- Over Rated and Over Stated -- Summary in Microsoft Word docx format

 

The essential components of Value Creation through Precision Configuration Based on Precision Taxonomies

The following are the components of value creation using precision configuration contrasted with the traditional approach to ERP configuration:

Item

Value drivers of Precision Configuration

Traditional ERP Configuration

1

The Precision Configuration approach demands critical thinking about the precise definition of the business which results in value adding use of the system

The conventional approach tolerates and encourages sloppy thinking and results in consultants who never really understand the business

 

 

 

2

Requires precise analysis of software setting options ensuring optimum use of the software

Sloppy thinking results in teams that never really understand how the software works

 

 

 

3

Provides a logical mechanism to rapidly configure products, customers, etc in fine detail facilitating maximum automated processing

Lack of logic and structure in the master data results in time wasting and imprecise product, etc configuration

 

 

 

4

Maximizes use of inherent software features maximizing effective use of the software including optimal configuration of workflow (process), etc

Clumsy configuration results in large parts of the software being sub-optimally used and also results in large amounts of unnecessary custom development, including numerous spreadsheets

 

 

 

5

Maximizes ease of use of the software resulting in improved speed and accuracy of posting, etc

Posting is sloppy and inaccurate and time consuming, lots of errors

 

 

 

6

Opens the door for small pieces of clever custom development and unconventional use of standard modules

Lots of roughly designed and built add-ons, lots of Excel spreadsheets

 

 

 

7

Supports optimized strategic and operational governance resulting in improved delegation and enhanced accountability through accurate modelling of the business

Increased overhead in the use of the system and inefficiencies hinder effective governance

 

 

 

8

Enables a rich diversity of standard reports to be produced before commencement of live operation allowing greatly improved management decision making

Even simple reports are time consuming to build and difficult to maintain with ongoing high maintenance costs and effort

 

 

 

9

Enables the production of rich multi-dimensional query facilities in the Business Intelligence environment improving business analysis and effectiveness and efficiency of operations

Such complex query facilities are almost impossible to develop and what is developed if of limited value

 

 

 

10

Greatly simplifies the production of rich business specific economic and other models supporting high end strategic and operational analysis

In most cases the business is not aware that such analysis is possible and attempts at advanced analysis usually end in failure or are extremely clumsy

 

 

 

11

Overall, at all levels of the business the system configuration facilitates greatly improved decision making resulting in greatly improved competitiveness and profitability

Typical installations hardly facilitate real high value decision making and frequently hinder it

There are dramatic differences between the two methods of ERP implementation.

Contact us for more information James@James-A-Robertson-and-Associates.com

The case for Strategic Customization

In the context of ERP, customization tends to be a swear word, however, in my experience there ARE situations where customization IS justified.

I define this customization as "Strategic Customization" it is limited scope, highly focused precision customization of small components that exploit the Strategic Engineered Precision Taxonomies (SEPT) to create highly valuable functionality at a fraction of the cost of alternative courses of action and which generate very significant business gain relating to the essence of the business and how it thrives.

       

 

The vertical scale represents strategic value, support for high level, high value decision making, return on investment, executive satisfaction and excitement – any measure which reflects a real satisfaction with the investment.


 
1.   The left-hand scale -- common practice

The left hand scale of 0 to 10 represents the standards that I typically see applied to ERP implementations.

It is characterized by high levels of executive frustration, inability to get answers when they are needed or at all, high system operating costs – senior consultants who make a living hacking things to keep the system going, high levels of customization, high levels of things done outside the system, no standards, etc.

This scale of mediocrity results from the lack of a high level strategic view in the original implementation – lack of support for the essence of the business and how it thrives, the lack of rigor in the implementation (lack of an "engineering approach"), all the things I talk about at my briefings and courses.

The most fundamental weakness of these implementations is the lack of what I term strategic engineered precision configuration built around strategic engineered precision  taxonomies which is the essence of the middle scale.


2.   The middle scale – taxonomy excellence

The middle, green, scale represents what is made possible with outstanding taxonomies – this includes things like “we have so much high quality management information it is fantastic”, “the audit fees have been slashed by 75%”, "we are operating with less staff" / "getting much more done with the same staff", "staff at all levels are strategically aligned", "the entire enterprise is running leaner and much more efficiently AND effectively", "this is one of the best investments we have ever made", "we should have done this years ago", etc.

This outcome results from strategic engineered precision configuration built on strategic engineered precision taxonomies implemented to JAR&A standards.

Even a mediocre implementation on this scale is likely to produce a better business outcome than an excellent implementation on the left-hand scale.


3.   The right-hand scale – strategic customization built on taxonomy excellence

The right hand, blue, scale represents what is possible if we add “strategic customization” to the mix building on opportunities created by the taxonomies and precision configuration.

It is vital to stress that "strategic customization" relates to customization that supports "the essence of the business and how it thrives" – customization that will not do this is NOT strategic and should be avoided.

Strategic customization relates to small pieces of very clever software or very clever system modification that ONLY work if there are precision taxonomies in place and well maintained.

Strategic customization allows the system to be effortlessly tailored to the operation of the business for limited expenditure in ways that most implementers think are impossible.

An example of strategic customization was a case where an investment of £20,000 in custom software allowed standard functionality in the ERP to be used to budget and project manage marketing across thousands of products and thirty cost bins for a distribution and brand management company that allowed that company to secure the business of one of the top brands in the world resulting in a substantial increase in value of brands managed – in other words it supported strategic growth.  It also delivered high levels of satisfaction to owners of existing brands that were being managed.

The sort of customization that characterizes most ERP and Data Warehouse implementations is so far removed from this that it is vital that you do not let that bad experience color thinking to resist strategic customization.

Strategic customization involves the investment of a small amount of time and money to fine-tune an ERP system that has cost hundreds of millions of dollars to develop to fit the target business far more closely and more effectively through primarily use of standard functionality.

The return on investment on really valid strategic customization is huge and it is only possible with precision taxonomies underpinning it.

This is where the opportunity lies for any ERP investment to produce a massive return on investment measured in terms of strategic competitiveness in the market place, the ability to run a leaner and more effective and efficient business, undertake strategic acquisitions quickly and efficiently and deliver a return on investment for the ERP implementation that is visible and understood by all in your organization without any calculation.

If this is all done with an outstanding implementation that conforms to the standards set out elsewhere on this website then the value to your organization will be far beyond anything that current paradigms indicate is possible.


Conclusion

I have total certainty that strategic customization is the cherry on the top of any ERP implementation and will deliver the highest return and you should all do what you need to do to ensure that the project executive and then the business are on-board with the value of doing this.

In general, the investment in strategic customization is likely to be small relative to the total cost of any significant ERP related project cost.

Please contact me on James@James-A-Robertson-and-Associates.com to discuss further.

Precision Taxonomies and Configuration

Part 6 of presentations for Two Day Course The Critical Factors for IT and ERP Investment Success.  Precision taxonomies and configuration

03.06 Critical Factors IT Investment Success -- Precision Configuration by Dr James A Robertson from James Robertson

 

Download Precision Configuration -- pdf Slides in Adobe pdf format

 

Download Precision Configuration -- Presentation in Power Point pptx format

 

Why not do it yourself without JAR&A?

Once you have read this manual and become sensitized to the issues you may consider doing the work yourselves.  Following are some reasons why it would be advisable to have some level of involvement from JAR&A:


1.   Like engaging an architect to design a complex building

As a general guideline, the process of designing a suite of Strategic Engineered Precision Taxonomies and Configuring your system is like the architectural design of a large and complex building.  It requires a highly experienced architect with an intuitive ability to discern what is best for your organization to design a building that really "works" for you.

So it is with a suite of Taxonomies, the high level architecture needs to be crafted in close consultation with your executives by a senior architect and then fleshed out to give the total design.  This work needs to be performed with painstaking attention to detail.  JAR&A offer such services.


2.   Years of experience

James Robertson has over 24 years' experience building taxonomies in the ERP, DW and BI domain and 45 years' experience with taxonomies.  The design of really well designed taxonomies is abstract and complex.


3.   Exceptional outcomes yield exceptional returns

The value of an exceptional, high value outcome is huge and dwarfs the investment in time and money many times over.  It is not wise to place this return at risk.  This is NOT the place to economize.


4.   Mediocre outcomes are not immediately evident

A mediocre or poor outcome is not evident unless you really understand the real potential of what has been missed.  You will only recognize a mediocre outcome if you dig into the standards and protocols that JAR&A apply and by then it will be too late.

Once you have fully configured and fully commissioned a business information system the cost of reconfiguring it is substantial. 


5.   High precision outcomes cut costs

High precision designs properly implemented drive operating costs down and dramatically increase business benefit.  This requires mature knowledge and experience to unlock the full solution potential.  Cutting corners and saving money at the start is NOT the right thing to do.


6.   Mediocre solutions drive up costs

A mediocre or poor design, whether well implemented or badly implemented, will drive operating costs up in perpetuity with no easy way to remediate the sloppy investment.


7.   20:80 -- NOT the place to economize

The SEPT precision configuration represents the 20% of the investment that will deliver 80% of the value return – this is NOT the place to economize.


8.    We will train your staff

We will work hand-in-hand with your staff and train them in our methods to the extent necessary for them to deploy and maintain the solution but we will provide the high level strategic facilitation to ensure that the proper precision strategic framework is created.


JAR&A are the best route to follow to provide you with this service -- contact us on James@James-A-Robertson-and-Associates.com

The major components of Precision Configuration:

The following are the major components of Precision Configuration:

1.   Accurately model the complexity of the REAL world in detail

Configure the software in such a way that the configuration accurately models the real world fundamentals and complexity of the business down to the finest detail such that executives and shareholders can look at the configuration and say “yes, that IS my business”


2.   Founded on precision taxonomies

Strategic, engineered, precision taxonomies – hierarchical, logical, semantic (word) definitions of the business in accordance with JAR&A standards


3.   Coupled to precision code schemes

Taxonomies coupled to precision code schemes that accurately reflect the semantic structure in alphanumeric, numeric or alpha codes that are logical and easy to learn and which comply with the rigorous standards defined by JAR&A and developed over 24 years


4.   Comprehensive strategic attribute definition

User defined attributes, every characteristic that the business might ever use to describe a product, customer, machine, asset, project, etc


5.   Intelligent hierarchical master file attribute setting

Master file attribute setting using intelligent cascading of parameters down the master hierarchy in order to ensure precise master record classification that draws on the full intelligence of the business specific taxonomies and strategic attributes


6.   Precision software switch setting

Set-up the software switches such that the way the software functions, coupled to the precision configuration data exactly models the real world complexities of the business


7.   Strategic functional business definition

A strategic level functional (macro activity) based approach to financial and other data that accurately creates a governance and management model leading to the empowerment and accountability of supervisors and managers at all levels leading to improved operational performance and efficiencies


8.   Strategic customization

Clever strategic customization drawing on the precision configuration to fit the software solution to the business like a glove and open up opportunities to harness the functionality of other modules more effectively thereby opening competitive opportunities


9.   Workflow and other automation

As an OUTPUT from all the above define business processes (workflow) and other software configuration at the operational level


10.   Rigorous data quality

Rigorous approach to data quality including capitalization, spelling, abbreviations and other presentation considerations – able to drill down to the raw transaction data in reports and dashboards without embarrassment


11.   Comprehensive pre-defined reports

Full suite of standard reports including a wide diversity of financial statements, product performance analysis, etc, etc – library of standard reports


12.   Comprehensive business intelligence models

Data warehouse equipped with a range of general purpose models as well as highly advanced business specific economic models – the ability to fully understand the business and support for high value business decisions

A high value competitive information engine that allows the business to run to maximum effectiveness and efficiency


085 - Precision configuration -- Information Technologies' orphan child

The single biggest "hard" factor in the under performance of business information systems relates to what I call "sloppy configuration", this presentation outlines a concept that I call "precision configuration" and explains how it can make a huge difference to business information system value delivery


Download Precision Configuration IT's Orphan Child -- Presentation in Power Point pptx format

Download Precision Configuration IT's Orphan Child -- Slides in Adobe pdf format


An example of an EXTREMELY weak code scheme -- ICD10 the International Classification of Diseases

Following is an extract from ICD10, the "International Classification of Diseases" code issued by the World Health Organization

This is one of the most badly designed code schemes in the World and it severely complicates and hinders ANY form of intelligent software functionality relating to clinical conditions

The section of codes below have been manually picked to correspond to a particular medical discipline, notice the gaps in the codes and that the codes do NOT sort with the logical clinical groupings, they are all over the place and there are many other unrelated codes in the gaps in the code scheme

Notice that the headings are NOT part of the code scheme and once these are removed the code becomes totally meaningless

This code is an International Standard and drives Clinical Coding and payment in many countries coupled to massive software and systems inefficiencies which directly impact the ability of software companies to develop intelligent software for use in third world countries with limited Medical Practitioner resources

There is a HUGE opportunity to develop a set of high quality codes to the standards set out on this website which would, in time drive substantial efficiencies and quite possibly strategic clinical benefits

Many business code schemes are similarly weak and this MASSIVELY compromises the effectiveness of software, see the Taxonomy Manual for information on how data SHOULD be structured

A code scheme as badly designed as this can dramatically drive up project costs, cause massive delays and cause total system and organizational failure in extreme cases.

I have seen projects and businesses crippled by such shockingly bad code schemes

RHEUMATIC HEART DISEASES
I 06.1 Aortic insufficiency
I 06.0 Aortic stenosis
I 06.2 Aortic stenosis,insufficiency
I 05.1 Mitral insufficiency
I 05.0 Mitral stenosis
I 05.2 Mitral stenosis,insufficiency
I 08.0 Mitral,aortic valve,disorder
I 08.3 Mitral,aortic,tricuspid,disorder
I 08.1 Mitral,tricuspid valve,disorder
I 07.1 Tricuspid insufficiency
I 07.0 Tricuspid stenosis
I 07.2 Tricuspid stenosis,insuffiency
HYPERTENSION
I 15.2 Endocrine disorders
I 10 Hypertension - essential 
I 15.1 Hypertension - other renal disorders
I 15.8 Hypertension - other second. 
I 15.0 Hypertension - renovascular
I 15 Hypertension - secondary 
I 11.0 Hypertensive heart disease,with failure
I 11.9 Hypertensive heart disease,without failure
MYOCARDIAL INFARCTION
I 21 Myocardial infarction - acute 
I 21.0 Myocardial infarction - anterior wall
I 21.1 Myocardial infarction - inferior wall
I 25.2 Myocardial infarction - old
I 23.8 Myocardial infarction - other complications
I 21.2 Myocardial infarction - other sites
I 21.4 Myocardial infarction - subendocardial
I 22.0 Myocardial infarction - subseq.anterior wall
I 22.1 Myocardial infarction - subseq.inferior wall
I 22.8 Myocardial infarction - subseq.other sites
I 22 Myocardial infarction - subsequent
COMPLICATIONS
I 25.3 Aneurysm - heart
I 23.3 Cardiac wall - rupture
I 25.5 Cardiomyopathy - ischaemic
I 23.4 Chordae tendineae - rupture
I 25.4 Coronary artery - aneurysm
I 24.1 Dressler's syndrome
I 23.0 Haemopericardium
I 25.6 Myocardial ischaemia - silent 
I 23.5 Papillary muscle - rupture
I 23.2 Ventricular septal defect
PERICARDITIS
I 33.0 Endocarditis - infective
I 30 Pericarditis - acute
I 31.1 Pericarditis - chronic,constrictive
I 30.0 Pericarditis - idiopathic
I 30.1 Pericarditis - infective
I 26.0 Pulmonary embolism,with cor pulmonale
I 26.9 Pulmonary embolism,without cor pulmonale
I 27.0 Pulmonary hypertension - primary
NON-RHEUMATIC VALVE DISORDERS
I 35.1 Aortic - insufficiency
I 35.0 Aortic - stenosis
I 35.2 Aortic - stenosis+insuff.
I 48 Atrial fibrillation
I 49.1 Atrial premature depolarization
I 44.0 Atrio-ventricular block - 1st °
I 44.1 Atrio-ventricular block - 2nd °
I 44.7 Bundle-branch block (L)
I 46.0 Cardiac arrest,successful  resuscitation
I 46.1 Cardiac death - sudden 
I 42.0 Cardiomyopathy - dilated 
I 42.1 Cardiomyopathy - obstructive,hypertrophic
I 42.2 Cardiomyopathy - other,hypertrophic
I 44.2 Complete heart block
I 50.0 Congestive heart failure
I 49.2 Junctional premature depolarization
I 34.0 Mitral - insufficiency
I 34.1 Mitral - prolapse
I 34.2 Mitral - stenosis
I 40.0 Myocarditis - infective
I 45.6 Pre-excitation syndrome
I 49.5 Sick sinus syndrome
I 47.1 Supra-ventricular tachycardia
I 49.3 Ventr. premature depolarization
I 49.0 Ventricular fibrillation
ANEURYSMS
I 71.3 Abdominal aortic - ruptured 
I 71.4 Abdominal aortic - without rupture
I 71.0 Aorta - dissection
I 71.1 Thoracic aortic - ruptured
I 71.2 Thoracic aortic - without rupture
I 71.5 Thoraco-abdominal,aortic - ruptured
I 71.6 Thoraco-abdominal,aortic - without rupture
OTHER DISEASES/SYNDROMES
I 70 Atherosclerosis
I 73.9 Peripheral vascular disease
I 73.0 Raynaud's syndrome
DISCIPLINE 12
ICD 10 DESCRIPTION
A
L 70.0 Acne vulgaris
L 02 Abscess - cutaneous 
L 23 Allergic dermatitis
L 65.9 Alopecia
L 64.9 Alopecia androgenic
L 63.9 Alopecia areata
L 02 Boil
C
C 44.0 Carcinoma - basal cell, lip
L 84 Callus
D 06 Carcinoma - squamous cell
L 03.9 Cellulitis
L 81.1 Chloasma
L 25.9 Contact dermatitis
D
L 89.2 Decubitus ulcer
L 21 Dermatitis-Seborrhoeic  
B 36.9 Dermatomycosis
C 43. Dysplastic naevi
E
L 20.9 Eczema - atopic
L 30.0 Eczema - nummular
H
B 00.9 Herpes simplex
I
L 60.0 Ingrown nail
L
L 93 Lupus erythematosus
M
D 22.9 Melanoeytic naevi - benign 
B 08.1 Molluscum contagiosum
P
L 42 Pityriasis rosea
L 40.9 Psoriasis
L 21.0 Seborrhoeic capitis
L 98.9 Skin disorder,unspecified
L 57.0 Solar keratosis
L 55.9 Sunburn
B 36.0 Tinea versicolor
L 50.9 Urticaria
W
L 82 Warts - seborrhoeic
B 07 Warts - viral

Outline of the JAR&A Approach to Supporting Economic Competitive Advantage Through Strategic Configuration of the Financial Suite

The following is an overview of my approach to assisting clients to achieve high value Economic Competitive Advantage in support of improved profitability and growth:

1.  Another opportunity for large scale commercial exploitation

Another area of my products and services that is getting close to being a recipe which is capable of large scale commercial exploitation although it requires significant cash investment to go all the way.  This technique was originally developed in 1990 but I only realized its full commercial potential relatively recently and brought the methods to a point where training of others is becoming possible.  I created the intellectual property that underpins this through an unremunerated investment of 1,000 hours in 1990 but it is only recently that I have reached the point where I can scale this and train others to do it.


2.  Sophisticated precision coding scheme

The conceptual basis of this solution is a sophisticated precision coding scheme assembled and maintained by sophisticated custom software thereby opening the door to extremely sophisticated corporate financial and economic analysis that is not possible any other way.  The use of these very sophisticated techniques is only possible with precision coding and once we have the precision coding the sophisticated analytical solution becomes affordably achievable.


3.  Founded on Strategic Engineered Precision Taxonomies (SEPT©)

The basic foundation of the approach is what I refer to as SEPT© Strategic Engineered Precision Taxonomies which are applied to every dimension of describing the business and its financial components including the Master Chart of Accounts.  See other documents that describe SEPT©


4.  Coupled to the Cubic Business Model©

These precision taxonomies are coupled to the Cubic Business Model© which is a logical coding construct comprising a set of coding conventions, standards and practices which together define a logical coding model that defines the entire business in its full complexity.  The basic concepts are widely known, it is the rigour and precision of my approach that causes it to be unique – I have never seen anyone else do this to my level of precision.


5.  Assembled using a precision tool – GL Builder©

In order to assemble these precision code schemes we (my software development partner and myself) have written a precision code assembly tool called GL Builder© which is now in its third generation building on an original solution written using spreadsheet macros in 1990.  In its present form GL Builder 3.5 represents a substantial investment.


6.  Creates a logical data platform for a comprehensive suite of analysis and planning tools – the Financial Analysis Suite©

The above content design yields a logical data platform on which a highly differentiated solution, the JAR&A Financial Analytical Suite©, will be built.  This suite will comprise an analytical database (Data Warehouse) built to take full advantage of the coding conventions and on which an easy to use financial reporting tool, a graphical reporting tool, a matrix (cubic model) reporting tool, an overhead attribution model and a budgeting and planning module can all be assembled.


7.  Facilitates high value competitive decisions resulting in increased competitiveness,  profitability and growth

This suite of tools will create a highly sophisticated “out of the box” financial and economic analysis, reporting and planning toolset that will be far more powerful than anything else available.  These tools will facilitate very substantial high value competitive decision support that will enable greatly increased competiveness, profitability and growth.

I hope that this provides some information to stimulate your interest in what I can offer in the area of General Ledger based financial analysis.


Cost drivers in building Taxonomies

The following are the drivers of cost in building taxonomies:

1.  Strategic executive top down approach

The strategic executive top down approach requires a very experienced executive level facilitator (and therefore expensive facilitator) for the upper levels of hierarchy development working closely with client executives and senior managers and guiding them to the optimum solution – cost cutting at this level compromises the long term strategic outcome of the investment – the right facilitator can add HUGE value for decades after they have completed their assignment.

 

2.  More complex and more abstract than it seems

While the final deliverable seems simple and obvious the process of getting there takes far more time than one would expect – it is only finished when all executives and managers can look at the product and say “yes, that is my business”.


3.  Facilitator must learn the business

During the first few iterations the facilitator is learning about the business at quite an intense and intimate level of detail with the result that the process is slower than one might expect.


4.  Client personnel must learn the approach

During these same interactions executives and managers are gaining a practical understanding of the application of taxonomies to their business and frequently are understanding taxonomies, modeling and the overall approach in depth for the first time.  This frequently causes their thinking to evolve drastically in the first few iterations with the result that two or three re-starts are quite common.


5.  Limitations on availability of senior client personnel

Because it is vital to get all the appropriate executives and managers in the room for specific sessions it is seldom possible to schedule sessions of more than 4 to 5 hours although full day sessions are generally more time efficient from a facilitator cost point of view – this can result in reduced facilitator efficiency and increased costs.


6.  Constraints on workshop frequency

For the same reason it is difficult to hold more than 2 or 3 sessions a week which is optimum from a technical progress perspective – this may necessitate shorter early morning or late afternoon or evening sessions in order to keep things moving forward within the constraints of executives and managers dairies – this can result in reduced facilitator efficiency and increased costs.


7.  Absence of key personnel generates rework

Trying to force progress by running sessions without all the appropriate people in the room frequently results in time consuming rework and frustration all round at subsequent sessions where the missing person or persons need to bring their component – slower is faster is frequently the harsh reality.


8.  Need for continuity and frequent sessions

In addition to the above it is vital that sessions progress at relatively closely spaced intervals – at least one and preferably two sessions a week.  Where there are gaps of several weeks both the business team and the facilitator lose the thread of the logic that is unfolding which results in wasted time as people get back up to speed and pick up the threads of previous sessions.  A gap of two or more weeks can result in several hours being lost at the start of a working session as people pick up the threads of the previous session.

This in turn can result in unintentional tangential thinking that requires loop backs and rework and further time loss and increased costs – intervals of no more than a week should be scheduled as far as possible and allowance made for increased costs where longer intervals are unavoidable.


9.  Understanding of hierarchies takes time

The logic of the hierarchy only becomes fully apparent when the hierarchy has been coded and the hierarchy can be collapsed using the codes.  Coding requires considerable behind the scenes cleaning of the hierarchy and can often result in a partial or complete recode being required.

This can give rise to considerable low visibility time and budget impact.  The longer the time intervals between working sessions, the more not all people are present in sessions, etc the more iterations of restructuring are required and therefore the more iterations of re-coding are required – the composite effect of these factors can drive considerable increases in cost for no visible benefit.


10.  All drive costs – tight management is essential

All the above factors drive costs.  Some are unavoidable while others can be curtailed in the event of close cooperation and time management by the client team and facilitator guided by the project manager.

The cost of a worst case scenario in terms of time efficiency can easily run to two or three times the cost of a best case well managed scenario.

Since so many of these cost factors are driven by client specific considerations it is only practical to work on a fixed fee basis where there is very strict time management on both sides which must include willingness by both parties to work overtime at any point where unexpected complexity is slowing progress.


11.  Master data configuration in the ERP

Once all the above taxonomy development stages are complete there is still considerable work required in terms of table specific configuration in the ERP, particularly in the case of items such as product catalogues where potentially dozens or even hundreds of fields may need to be carefully populated for thousands of records.  The use of taxonomy based software to facilitate this process is strongly recommended.  The precision of the use of the ERP and related software will ride on the level of precision of the configuration down to the last product or material record.


12.  Reports, models, etc – the Analytical Suite

Having created highly structured intelligent data™ all we have done is laid the foundation.

It is then necessary to create a rich variety of reports and models in order to harvest the value that is now embedded in the data – this should be done first in the Data Warehouse under almost all circumstances.

In the Financial General Ledger domain we have recently specified and commenced development of the JAR&A Analytical Financial Suite™ which is a comprehensive range of reporting and analytical tools and models that can be rapidly connected to data built to our standards in order to deliver a rich yield of “touch of a button” management information tools and resources

Please contact us for more information -- James@James-A-Robertson-and-Associates.com


An ATROCIOUS Code Scheme -- CPT4 -- Current Procedural Terminology Clinical Codes

Far worse than the ICD10 Code Scheme discussed above the CPT4, Current Procedural Terminology code of the American Medical Association is close to the worst code scheme I have ever seen

In fact, it is NOT correct to refer to it as a Code Scheme, there is next to NO logic

Notice in the example below that if the headings are removed the codes are completely meaningless -- this requires that sophisticated cross mapping is required in order to try and make sense of the data and any form of software or business intelligence application becomes massively complex and inefficient

Below the section with the headings a portion of the code sorted without the headings is listed to give you an idea of how shockingly bad this code scheme is

This code is an International Standard and drives Clinical Coding and payment in many countries coupled to massive software and systems inefficiencies which directly impact the ability of software companies to develop intelligent software for use in third world countries with limited Medical Practitioner resources

There is a HUGE opportunity to develop a set of high quality codes to the standards set out on this website which would, in time drive substantial efficiencies and quite possibly strategic clinical benefits

With headings

GENERAL PRACTITIONERS
CPT 4 Description
Office or outpatient visit
New patient
99201 10 min/Limited problems
99202 20 min/Low severity
99203 30 min/Mod. severity
99204 45 min/Mod.-high severity
99205 60 min/High severity
Established patient
99211 5 min/No doctor present
99212 10 min/Minor problem
99213 15 min/Low - mod. severity
99214 25 min/Mod. - high severity 
99215 40 min/High severity
Observation care discharge services
99217 Observation and discharge 
Initial observation care per day
99218 Low complexity
99219 Mod. complexity
99220 High complexity
Hospital inpatient services
New or established patient (initial care)
99221 30 min/Low severity
99222 50 min/Mod. severity
99223 70 min/High severity
Subsequent Hospital Care
99231 15 min/Pt. recovering/improving
99232 25 min/Pt. responding inadequately
99233 35 min/Pt. unstable
Hospital discharge services
99238 Day management:30min/<
99239 Day management:>30min
Office or other outpatient 
consultations
New or established patient
99241 15 min
99242 30 min
99243 40 min
99244 60 min
99245 80 min
Initial inpatient consultation
New or established patient
99251 20 min
99252 40 min
99253 55 min
99254 80 min
99255 110 min
Follow-up inpatient consultation
99261 10 min/Pt. stable
99262 20 min/Pt. responding inadequately
99263 30 min/Pt. unstable/new problem
Emergency department services
99281 Minor problems
99282 Low - Mod. severity
99283 Mod. severity
99284 High severity
99285 High severity - life threatening
Follow-up inpatient consultation
Established patient
99331 10 min/Pt. stable
99332 20 min/Pt. responding inadequately
99333 30 min/Pt. unstable
Prolonged services
Office or other outpatient setting
99354 First hour
99355 Each additional 30min
Inpatient setting
99356 First hour
99357 Each additional 30min
Care plan oversight
99375 30-60min
99376 > 60 min
TELEPHONE CALLS
99371 Brief
99372 Give advice
99373 Lengthy
Preventive visit
New patient
99381 New infant
99382 Early childhood (1-4 years)
99383 Late childhood (5-11 years)
99384 Adolescent (12-17 years)
99385 18-39 years
99386 40-64 years
99387 65 years and over
Established patient
99391 New infant
99392 Early childhood (1-4 years)
99393 Late childhood (5-11 years)
99394 Adolescent (12-17 years)
99395 18-39 years
99396 40-64 years
99397 65 years and over
Additional
0901 L After hours E/M service
per 15min
(15 min x _______________)
Supplies and materials
99070 Other than usual materials

Without Headings

Notice the recurrence of values such as counts of minutes and size which should be captured numeric values NOT in the code

GENERAL PRACTITIONERS
10060 I&D skin abscess:simple
10061 I&D skin abscess:compl.
10120 Foreign body - removal,simple
11401 0,6 - 1,0cm
11402 1,1 - 2,0cm
11403 2,1 - 3,0cm
11420 < 0,5cm
11421 0,6 - 1,0cm
11422 1,1 - 2,0cm
11423 2,1 - 3,0cm
11440 < 0,5cm
11441 0,6 - 1,0cm
11730 Simple:single
11731 Simple:second
11732 Simple:each additional
11750 Removal nail bed
11765 Excision nailfold, eg. toe
11770 Excision pilonidal cyst;simple
12001 < 2,5cm
12002 2,6 - 7,5cm
12004 7,6 - 12,5cm
12005 12,6 - 20,0cm
16000 1st degree,initial treatment
16020 Small
16025 Medium
16030 Large
17000 One lesion
17001 Second, third lesion
17002 > 3,each additional
17100 One lesion
17101 Second lesion
17102 > 2-15, each additional
17104 > 15 lesions
17105 Extensive lesions
17110 Destruction flat wart,< 15
17200 Electrosurgical,< 15
17201 Electrosurgical,each additional 10
17250 Chemical cauter,granulation tissue
26010 Drainage finger abscess:simple
29075 Short arm plaster
29085 Hand / forearm plaster
29125 Short arm splint
29405 Short leg cast
29425 Short leg cast, ambulatory
29435 Patellar tendon bearing cast
29515 Short leg splint
30300 Nose - foreign body
30901 Nasal haemorrhage,simple
36000 Introduce needle/intracatheter,vein
42820 T's & A's;age < 12
42821 T's & A's;age 12<
42830 Adenoidectomy;age < 12
53670 Catheterization,simple,urethra
54001 Slitting of prepuce,not newborn
58120 D&C,diagn./therapeutic
58300 Insert IUD
58301 Remove IUD
65205 Eye - foreign body
94664 Inhalation; initial evaluation
94665 Inhalation; subsequent
99070 Other than usual materials
99201 10 min/Limited problems
99202 20 min/Low severity
99203 30 min/Mod. severity
99204 45 min/Mod.-high severity
99205 60 min/High severity
99211 5 min/No doctor present
99212 10 min/Minor problem
99213 15 min/Low - mod. severity
99214 25 min/Mod. - high severity 
99215 40 min/High severity
99217 Observation and discharge 
99218 Low complexity
99219 Mod. complexity
99220 High complexity
99221 30 min/Low severity
99222 50 min/Mod. severity
99223 70 min/High severity
99231 15 min/Pt. recovering/improving
99232 25 min/Pt. responding inadequately
99233 35 min/Pt. unstable
99238 Day management:30min/<
99239 Day management:>30min
99241 15 min
99242 30 min
99243 40 min
99244 60 min
99245 80 min
99251 20 min
99252 40 min
99253 55 min
99254 80 min
99255 110 min
99261 10 min/Pt. stable
99262 20 min/Pt. responding inadequately
99263 30 min/Pt. unstable/new problem
99281 Minor problems
99282 Low - Mod. severity
99283 Mod. severity
99284 High severity
99285 High severity - life threatening
99331 10 min/Pt. stable
99332 20 min/Pt. responding inadequately
99333 30 min/Pt. unstable
99354 First hour
99355 Each additional 30min
99356 First hour
99357 Each additional 30min
99371 Brief
99372 Give advice
99373 Lengthy
99375 30-60min
99376 > 60 min
99381 New infant

Key requirements to develop taxonomies as quickly and efficiently as possible

The following are the components necessary to run a Taxonomy project as efficiently and effectively as possible:

1. Project manager from start with clearly defined finely granular project plan


2. Project charter that clear spells out client responsibilities in terms of availability of personnel, delays in schedules, etc – see subsequent document


3. Clear project management approach in which client fully understands uncertainties in design duration and the extent to which their actions will impact these uncertainties and therefore time and cost


4.  At the start of the project agree who must be in the room for the various sessions and agree on measures that will be taken if a key person cannot be in the room – reschedule with standing time, go ahead but accept compromises that the missing person cannot subsequently change, etc


5. Refuse to start workshops where all designated personnel are not present or accept there will be unbudgeted rework or will be compromises


6. Accept that it will take longer to understand the approach than it first seems – the approach  is complex and time consuming


7. Accept that this is a new way of looking at information and looking at the business and therefore that there will be significant revisions during the process that will result in the process taking longer than expected


8. Must printout the work after cleaning up after sessions and engage with and review the outputs – if there has not been quality engagement with the working papers between sessions this will take time in sessions and slow down the process and increase costs


9. Workshops must take place at closely spaced intervals – at least one day every week else there will be time on refreshing on both sides – extra costs where there are delays of more than two weeks


10. Most sessions will be full 8 to 10 hour days without interruption unless shorter hours are agreed but then must understand that there is a start-up cost for every session – takes half an hour to an hour to get up to speed unless sessions take place more or less back to back


The essential components of Precision Configuration based on Precision Taxonomies

The following are the major components of Precision Configuration:

1.  Accurately model the complexity of the REAL world in detail

Configure the software in such a way that the configuration accurately models the real world fundamentals and complexity of the business down to the finest detail such that executives and shareholders can look at the configuration and say “yes, that IS my business”


2.  Founded on precision taxonomies

Strategic, engineered, precision taxonomies – hierarchical, logical, semantic (word) definitions of the business in accordance with JAR&A standards


3.  Coupled to precision code schemes

Taxonomies coupled to precision code schemes that accurately reflect the semantic structure in alphanumeric, numeric or alpha codes that are logical and easy to learn and which comply with the rigorous standards defined by JAR&A and developed over 20 years


4.  Comprehensive strategic attribute definition

User defined attributes, every characteristic that the business might ever use to describe a product, customer, machine, asset, project, etc


5.  Intelligent hierarchical master file attribute setting

Master file attribute setting using intelligent cascading of parameters down the master hierarchy in order to ensure precise master record classification that draws on the full intelligence of the business specific taxonomies and strategic attributes


6.  Precision software switch setting

Set-up the software switches such that the way the software functions, coupled to the precision configuration data exactly models the real world complexities of the business


7.  Strategic functional business definition

A strategic level functional (macro activity) based approach to financial and other data that accurately creates a governance and management model leading to the empowerment and accountability of supervisors and managers at all levels leading to improved operational performance and efficiencies


8.  Strategic customization

Clever strategic customization drawing on the precision configuration to fit the software solution to the business like a glove and open up opportunities to harness the functionality of other modules more effectively thereby opening competitive opportunities


9.  Workflow and other automation

As an OUTPUT from all the above define business processes (workflow) and other software configuration at the operational level


10.  Rigorous data quality

Rigorous approach to data quality including capitalization, spelling, abbreviations and other presentation considerations – able to drill down to the raw transaction data in reports and dashboards without embarrassment


11.  Comprehensive pre-defined reports

Full suite of standard reports including a wide diversity of financial statements, product performance analysis, etc, etc – library of standard reports


12.  Comprehensive business intelligence models

Data warehouse equipped with a range of general purpose models as well as highly advanced business specific economic models – the ability to fully understand the business and support for high value business decisions

A high value competitive information engine that allows the business to run to maximum effectiveness and efficiency


Taxonomy Handbook

The James A Robertson and Associates Taxonomy Handbook is a collation of diverse articles relating to the subject of Precision Configuration and Taxonomies

The handbook is available to read on the website 

The Handbook is available here for download

            

The set of documents is in Win rar format -- download the utility from http://www.rarlab.com/download.htm if you do not have the utility

The full contents of this manual are also available in the "Taxonomy Documents" section of the "Article Catalogue" on this website

 

Further information regarding Precision Configuration on this website

The following pages on this website contain further information relating to the subject of Precision Configuration:

The page "Precision Taxonomies" discusses the subject of Precision Configuration in the context of "Strategic Engineered Precision Taxonomies"  Strategic Taxonomies, highly structured hierarchical lists designed to reflect the strategic essence of the business from an executive perspective are a fundamental factor in achieving the massive strategic and operational effectiveness and efficiency benefits that are referred to above

The page "Cubic Business Model" discusses the specifics of the JAR&A Cubic Business Model as a logical concept for integrating all the information in an enterprise at a financial and organizational level in a highly structured manner that gives rise to major business efficiency and governance effectiveness benefits allowing the organization to scale substantially with the same management and administrative headcount while drastically reducing audit and other operational costs and greatly improving operational management efficiency and effectiveness

The Cubic Business Model provides a logical framework for the construction of an Enterprise Chart of Accounts that supports highly efficient consolidation and group wide financial analysis.  Replicated in other modules of integrated systems the Cubic Model provides the basis for the same analytical capabilities with regard to production, human resource and other information

The page "Chart of Accounts" discusses the use of a "Highly Structured Strategic Chart of Accounts as a vital element of your corporate information arsenal" and explains the weaknesses in typical Chart of Accounts design relative to the highly structured strategic taxonomies advocated here.  The page outlines the JAR&A approach to the design of the Chart of Accounts as a highly structured taxonomy as a fundamental building block in the Cubic Business Model.  This capability is supported by sophisticated software designed and built specifically for JAR&A

The page "Product Catalogue" discusses the Product Catalogue as an essential element of any Precision Configuration and gives an overview of the design approach.  This approach to the development of a strategic product catalogue is fundamental to the major strategic competitive benefits achieved by African Sales Company, outlined higher up on this page

The page "Attributes" discusses information Attributes in the context of "answers to the questions you have NOT yet thought to ask" a fundamental and exceptionally powerful concept in terms of unlocking the true value of Business Information Systems at the strategic level and touches on the dramatic benefits achieved by CRM Risk Control through a very simple piece of software implemented with strategically designed attribute lists defined at the executive level

The use of what I term "clever strategic software", small pieces of clever custom software tuned to the strategic business information content and the essential strategic drivers of the business can create HUGE competitive advantage by enabling the organization to do things that their competitors cannot begin to imagine doing -- this is also inherent in the ASCO case study above

Note that the entire concept of "strategic configuration" is associated with levels of ease of use and fluidity of system operation that cannot be imagined with traditional configurations

These same techniques can be applied to the classification of human resource attributes thus unlocking the full potential of the job analysis and competence analysis capabilities of human capital management software

Precision Configuration, particularly in the context of Strategic Business Information Architecture, the strategic definition of information content ranging from Item Class / Materials Master, etc through to the Chart of Accounts and all the attribute tables in between is substantial and WILL UNLOCK the FULL potential of your business systems as high value strategic resources in your business

These techniques CAN be retrofitted to your EXISTING systems on an incremental basis.  This will start by adding precision lists to your Data Warehouse and mapping your existing data onto these lists (coupled with enhancement of the existing lists).  Thereafter the precision lists can be dropped into your operational software incrementally subject to the constraints of the existing data.  Carefully planned and executed this approach can, over time, dramatically raise the standards of your existing installation in a practical and affordable manner that will deliver very substantial long term competitive benefits.  These benefits will enable you to improve competitiveness, grow faster and more sustainably AND operate more profitably

Inherently these techniques add huge value at the Business Intelligence level enabling sophisticated and powerful models tuned to the exact strategic attributes of the business to be easily built and maintained.  The ease of inquiry of the highly structured data, maintained to exceptional standards of engineering precision, easily enables models of a level of sophistication that most executives can only dream of

Keep in mind that the fundamental driver for this entire approach IS Strategic Decision Support.  From the very outset in 1982 I have understood that supporting high value strategic business decisions and strategic business capability -- that is, supporting "the essence of the business and how it thrives" is THE fundamental goal of Integrated Business Information Systems, all the rest, the operational benefits and efficiencies is second order and flows naturally and automatically from an integrated solution implemented with prime focus on supporting the essence of the business and how it thrives -- see the work of Professor Malcolm McDonald on Strategic Marketing Planning to better understand what I am referring to

These methods and principles are equally applicable in EVERY area of business information systems such that a comprehensive, holistic, integrated business information system (IBIS) implementation to these standards will easily deliver AT LEAST a 100 fold improvement in long term sustainable business outcome relative to traditional methods coupled to dramatic return on investment

The same principles apply to ANY other software system that acquires any sort of information that can be classified in any way.  I constantly see websites that acquire simple information and which would deliver dramatically improved management information if these principles were applied

This entire approach is predicated on a fundamental experientially validated view that says that since engineers design structures down to the last nut and bolt it is entirely possible to design the information classification schemes in any business information system to the same standards of rigour and precision.  I have personally applied the broad engineering principle in all my endeavours since my earliest experience of designing and building things that work and have applied these principles to the configuration of business information for over many years such that I KNOW that they are valid and viable and deliver dramatically better results

That said, it is only relatively recently that I have come to understand that virtually nobody else understands these principles let alone applies them to the necessary standards.  Since realizing that there IS a huge need to communicate these principles it has taken further years to understand how to articulate and communicate them in ways that others can understand and embrace

I hope that these webpages go some way to achieving this goal

Please email me at James@James-A-Robertson-and-Associates.com for more information

Information Architecture and Design of FIS

Rennies Group Limited Case Study

Financial Information Systems Conference

By Kerstin Speer CA(SA), Group Financial Manager, Rennies Group Limited and Dr James A Robertson PrEng


SYNOPSIS

The background to the introduction of a Group-wide financial reporting and management information system for Rennies Group Limited (RGL) is outlined in the context of current thinking on the application of Financial Information Systems (FIS). The status of the Rennies Reporting System (RRS) at the time the decision was taken to develop an information architecture and design is summarized.

The desired components of a three year FIS strategy are presented together with the FIS strategy already in place at RGL.

Considerations with regard to the implementation at RGL are given with particular reference to the fact that a clearly defined customer focused business strategy was already in place and that an EVATM programme was underway.

The procedure followed in undertaking the information architecture and design of the Rennies Group consolidation Master Chart of Accounts included extensive involvement of users and management, definition of a generic, structured business information classification scheme and building a framework to support future development. It is noted that provision is made for a future business model to be developed which will support full cascading of the chart of accounts down to the operational business unit level while maintaining the integrity of the consolidation process. Also revenue and cost driver classification was undertaken in a manner that was independent of individual business units and which will support restructuring, acquisitions, mergers and divestments in the final form of the business model.

A conceptual framework for inter-region, branch and subsidiary analysis has also been laid.

The manner in which RGL has integrated existing systems is outlined with particular reference to the upload of the financial intelligence of the software to assist with integration is described. The importance of the information architecture in achieving this objective is highlighted.

The benefits of implementing FIS are outlined and it is noted that certain flagship operations have leveraged the capabilities of the solution by moving their management reporting function onto the new system while it was still in pilot operation. These sites achieved considerable improvement in analysis and reporting capability with a resulting time saving that was used to free financial personnel up to undertake more effective analysis.

A summary of the benefits that RGL has obtained from FIS strategy is provided and it is noted that the current project has laid the foundations for a long term process of progressively improving management information delivery and decision support within the Group in a manner that has the potential to enable the Finance Function to add considerable value to the operating entities.

It is concluded that effective information architecture and design is vital to ensuring a return on investment in FIS and that, if this is correctly undertaken and implemented, it will enable the Finance Function to add considerable value to the organization at all levels.


1.  INTRODUCTION

The concept of Financial Information Systems is well established as a result of many conferences and other development. Robertson has addressed a number of aspects of this subject, most recently at the Financial Management Information Systems Conference, held in Midrand in September 1994 at which a paper entitled, Identifying Your Key Business Objectives to Develop a Coordinated FMIS Strategy that Meets Your Specific Needs was presented. As a result of the presentation to this conference, it was decided to introduce some of the concepts addressed in the presentation into the "Rennies Reporting System" (RRS), which was currently being planned.

RRS is a group-wide consolidation and reporting system using a commercial consolidation product, Hyperion. RRS objective is to consolidate information from the approximately 220 operations in the Rennies Group up to Group Head Office in Johannesburg in a manner that will support Group reporting requirements and support the overall business strategy of the Group. This paper presents some of the concepts applied in the project to date in the form of a case study.

As noted above, the solution was implemented using commercially available software. This was installed on a client-server database platform. The subject of this case study is therefore not the design or selection of a software and technology solution but the information architecture and design of the business solution implemented using the product selected. It is hoped that this paper will serve to draw readers attention away from technology and cause them to focus on the business design issues surrounding the use of Information Technology (I.T.) in general and FIS in particular.


2.  WHAT SHOULD FIS STRATEGY ENTAIL

Robertson, in the paper referred to above, recommends that a three year FMIS strategy should incorporate the following:

a. Determine broad business objectives.

b. Determine what financial information is required in order to give effect to these objectives

c. Determine what financially related business concepts should be introduced or enhanced in order to meet these objectives in support of improved management decision making.

d. Evaluate the fundamental changes to financial operating procedures and systems required to support the objectives including:

i.    First principles analysis of financial systems and coding systems.

ii.  First principles analysis of the business model incorporated into the financial systems to support unambiguous ownership.

iii.  Comprehensive review of up-stream and down-stream controls on the flow of information in the FIS.

iv. Evaluation of implementation considerations with regard to system acceptance.

e. Investigate use of multiple bases of accrual.

f. Develop overlay ledgers for different levels of adjustment, such as EVA.

g. Develop a culture of future focused management applying these concepts to create and sustain competitive advantage in a manner that truly adds value to the organization.

h. Consider the extension of the FIS to become part of a "Corporate Command Center"

This approach to FIS strategy is the vision of the Rennies Group and has the commitment of management. It also has the potential to truly differentiate the organization.


3.  RENNIES GROUP IMPLEMENTATION CONSIDERATIONS

In the case of Rennies Group Limited (RGL), the project was undertaken as an extension of an existing project which was already underway. In particular, RGL had already clearly defined its strategic objectives as a customer focused service organization and had appointed Stern Stewart and Company to implement a comprehensive Economic Value Added (EVATM) program. In addition, the technology platform and software for the RRS had already been selected and a project plan had been drawn up.

The implementation was therefore undertaken on a limited scale with emphasis on first principles analysis of the information classification schemes and coding of the Group Consolidation Ledger to support the great diversity of businesses in the Group. The group ranges from well-known operations such as Rennies Travel, Rent a Bakkie, Renfreight and XPS to less well known trading and freight management businesses such as Manica which operates throughout Southern and Central Africa.

Basic consideration was given to conceptualization of the business model and overlays for management accounting purposes but these will be designed in detail as part of a later phase of the project.

Implementation was undertaken by way of a multiple pilot site deployment in terms of the original project plan under the guidance of Group Information Services.

Accordingly, this paper concentrates on the information architecture and design of a Group Consolidation Chart of Accounts to serve the full diversity of companies within the group.


4.  INFORMATION ARCHITECTURE AND DESIGN OF THE GROUP REPORTING GENERAL LEDGER CHART OF ACCOUNTS

Design was undertaken by way of a series of workshops with senior financial and operational managers of the larger divisions and companies within RGL. During these workshops, the following was achieved:

a. Widespread consultation with senior end users.

b. Development of a clear understanding of the diversity of businesses within the Group with a particular emphasis on determining business unit independent definitions of Revenue Drivers and Cost Drivers in a manner that would enable a generally applicable chart of accounts to be developed which would accommodate any change in organizational structure, including acquisitions, mergers and divestments.

c. Design of a highly structured information classification scheme that supported full hierarchical analysis and drill down within the guidelines given by Robertson (19949 and others).

d.  A design that supported both disbursement and expense orientated operations.

e. A framework to support monthly, year-end, tax, management and EVA reporting requirements, amongst others.

f.  A clear understanding of the business model that should be implemented.

g. Conceptual definition of a framework against which inter-region, inter-branch and inter-subsidiary analysis could be implemented at a later stage. This also provided a conceptual framework for definition of a market sector input : output analysis at the financial level.

h. Definition of a solution that could be "cascaded" through the Group to individual operating companies and eventually to SBU level.

i.  Definition of a solution that would provide the foundation for business modelling and a broad based "Executive Information System" (EIS) at a later date in a manner that would enable Group Finance to add considerable value to individual operating companies in time.

The information architecture and design of the RRS Chart of Accounts was spread over a period of approximately two months with a high level of involvement from the Group Financial Manager, Project Manager, Consultant and other team members throughout this period. Approximately ten workshops of from two to eight hours duration were held with users and management of groups of subsidiaries and individual companies. Further project meetings took place throughout the period. The end result was a consolidation chart of accounts with approximately 700 posting level accounts suitable for implementation across the entire organization at a business unit level.


5.  HOW RENNIES GROUP LIMITED HAS INTEGRATED EXISTING SYSTEMS

Existing general ledger systems were integrated in the following way:

a. Existing general ledger charts of accounts were mapped onto the Hyperion consolidation chart of accounts in paper mapping exercises facilitated by the project team.

b. ASCII upload files were generated from the existing systems in a format that could be uploaded into the Hyperion software.

c. The functionality of Hyperion permitted a direct link between existing systems such as Accpac, Accountability and Millenium through account conversion and name conversion tables.

d. The upload used as building blocks groups of accounts classified into categories including:

i.   Income statement accounts (revenue, disbursement and expense).

ii.  Balance sheet accounts (intangible assets, assets, liabilities).

iii. Reporting accounts such as cash flow and budget.

iv. Balance and control accounts.

v. Non-financial, derived and other information for purposes such as tax, year-end, EVATM, etc.

e. A basic business entity model was implemented in order to provide systematic consolidation into Divisions and from Divisions to Group. This model reflects the organizational structure of the group.

f. Separate input and adjustment entities are defined for use in different stages in the process.

g. Input ledgers are maintained in the currency of origin and foreign currency translation takes place at the appropriate location in the organizational structure.

h. Reporting is performed using the reporting capabilities of the tool used together with dynamic linking to the Microsoft Excel Spreadsheet package.

The project team is currently busy with the deployment of the application to further sites and the extension of the application to more fully support all aspects identified.

Business modelling, market modelling, geographic analysis and the introduction of an EIS are scheduled to take place in the second half of the year.

Effective integration was made possible by the structured financial information classification contained in the Master Chart of Accounts referred to previously. This structure ensures that, while individual subsidiaries may apply different accounting treatments with regard to aspects such as disbursements, the Group consolidation figures are based on a uniform treatment which accommodates the diversity of business operations.

 

6. BENEFITS OF IMPLEMENTING FIS

While the RRS system will only run live from 1 July 1995, it is currently in use for budget purposes for the 1995/96 financial year. It is currently deployed at the Divisional Level as well as at 18 major operations.

Benefits that are anticipated from the RRS include a saving in the production of the Group Tax statements of approximately three weeks at year-end, a saving in producing the year-end pack of approximately two weeks together with a considerable reduction in reconciliation and manual reprocessing effort. A monthly saving of 3 days per month at Group Level in producing consolidated Group Financial Reports is anticipated.

It has been found that all operations have been able to map their existing general ledger accounts onto the consolidation chart of accounts successfully, although individual entities have experienced some difficulty where more detail has been requested than they are accustomed to providing.

More tangible benefits have been experienced at certain pilot sites where enthusiastic and proactive involvement by financial management and the executive of the companies concerned has resulted in the full potential of the system being realised. In one notable case, a subsidiary moved it's management reporting off their existing bureau based general ledger systems onto the new system while still in the pilot stage because of the greatly improved reporting capabilities of the new system.

In this case, the time saving resulting from improved ease and effectiveness of reporting has been beneficially utilized in undertaking more detailed analysis in support of management effectiveness. This is expected to give rise to better decision making with regard to branch viability and competitiveness and an increase in market share is projected as a result.

In another notable case, a one-to-one link between the existing general ledger system and RRS has created a powerful reporting tool which is exploited fully by this operation. Furthermore, by efficiently using the name structure capabilities of the tool, reporting of profit centres by region, product type and executive is simple and flexible and is empowering the user in preparing financial information.

In flagship cases such as the above sites, a major benefit to Group Finance has been an opportunity to be seen by subsidiaries to be adding value to the operations of the Group. This demonstrates the potential synergy of a forward thinking central Group Finance Department anticipating the decision support information needs of subsidiaries.

 

7. WHAT HAS RENNIES GROUP LIMITED GAINED FROM FIS?

The expected benefits of the RRS FIS and those experienced to date are set out in the preceding section.

In addition, Rennies Group has gained a platform on which a wide variety of value adding services can be delivered by Group Finance and financial management of individual operating companies. This business solution platform provides a basis on which:

a. Improved Group reporting can be built.

b. A corporate business model can be implemented.

c.  Group-wide EVATM analysis and reporting can take place.

d. Reporting of Key Performance Indicators (KPI's) including non-financial components can be undertaken.

e. Regional and market based analysis can be designed and implemented

f. Improved reporting effectiveness at the operational level and improved management decision support.

Significant further analysis and design of the business model and other components referred to above will be required before these can be implemented. Much of this is planned for the second half of 1995.


8. CONCLUSION

The background concepts and business environment surrounding the Rennies Reporting System have been outlined together with major considerations taken into account in the information architecture and design of the system. Particular emphasis is placed on the importance of effective information classification and the approach adopted in developing a Group-wide Master Chart of Accounts is set out in some detail.

Principal strategic considerations and factors to be taken into account in planning the FIS project have been summarized.

Certain initial benefits experienced by Rennies Group Limited, including dramatic improvement in financial management reporting capability of flagship sites are outlined. Other expected benefits are summarized. Opportunities to develop market focused analysis and reporting capabilities are identified as a particularly important component of future opportunities.

It is concluded that effective information architecture and design of an FIS can give rise to significant benefits and are vital if the Finance Function is to be seen as adding value to the organization.


ACKNOWLEDGMENTS

The support of the management of Rennies Group Limited and their permission to publish this paper is gratefully acknowledged as is the contribution of all members of the project team.

The contribution of dS2's clients, associates and staff, without whom it would not have been possible to evolve and develop these concepts is gratefully acknowledged.

 

FOOTNOTE

Rennies Group Limited is an investment and management company in a multi-business netork focusing on freight management, travel and other related services. The Group provides resource backing to autonomous operating companies operating in Southern Africa through ownership and internationally through alliances.

Rennies Group Limited is jointly controlled by two major South African corporations, namely Safmarine and Rennies Holdings Limited and Anglo American Industrial Corportion Limited.

The Rennies Group has operated in Southern Africa for 146 years and is a regional force in the transport services industry. Employing some 10,200 people, Rennies offers in excess of 30 different services through more than 350 locations in eight countries in Southern and Central Africa.

The Group's current strength and future strategy linges on three crucial factors:

- A single-minded focus on managing the movement of people & freight.

- The depth of its skills.

- The breadth of its network.


Differentiated Strategic Solutions (Pty) Ltd is a firm of independent business information system specialists, management consultants and software developers. They are able to provide the full range of professional services necessary to architect, design and implement financial information systems and to integrate existing systems including all aspects outlined in this paper.

Particular emphasis is placed on aspects of design and implementation necessary to improve business process and maximize information return on investment. Products and services include the information and systems architecture, design and implementation of financial information systems from a fundamental first principles basis, the conceptualization, specification, construction and implementation of integrated information systems, enterprise information systems (EIS), corporate command centres and other business information systems.

They also offer a range of services with regard to strategically focused financial management information determination and linking financial planning to business strategic and macroeconomics in terms of the capability of the balance sheet and economy to sustain strategic objectives. System audits, development of IT strategies and business system feasibility analysis are other services.

Together with associates in The MaXus Group and other associated specialists they are able to provide a wide range of additional consulting and other services in support of the concepts outlined in this paper extending to comprehensive Business Process Optimization services applying techniques developed through an international network of expertise. dS2 can be contacted on Johannesburg 886-9863 or fax 787-0132.


REFERENCES

Robertson, J A (1994) Identifying Your Key Business Objectives to Develop a Coordinated FMIS Strategy that Meets Your Specific Needs Presented at Financial Management Information Systems Conference, Midrand, September 1994.

30 to 31 March 1995

P26

Download the Information Architecture and Design of FIS for Rennies Group -- Article in Adobe pdf format


026 Information Architecture and Design of FIS -- Rennies Group Limited Case Study -- by Dr James A Robertson PrEng from James Robertson


Download Information Architecture and Design of FIS -- Rennies Group Limited Case Study -- Slides in Adobe pdf format

Download Information Architecture and Design of FIS -- Rennies Group Limited Case Study -- Original Paper in Adobe pdf format


Designing and Implementing an Integrated Risk Management System that Effectively Minimizes Your Exposure

Integrated Risk Management Conference

By Dr James A Robertson PrEng and George J Paton, Director, CRM Risk Control Consultants


SYNOPSIS

The management of risk in organizations today is becoming of increasing importance as insurance premiums and liability risks increase and as the hidden costs of risk in areas such as down-time, customer dissatisfaction and other factors increase.

Effective management of risk is therefore becoming a strategic necessity. Risk management in the area of physical risk is an aspect of business that is frequently overlooked or is approached on an ad-hoc basis. This paper sets out some of the factors that should be taken into account in implementing risk management solutions and identifies the need for such solutions to be holistic in nature. In particular, it is noted that the physical and financial components of risk management should be tightly integrated and that the management of maintenance on a risk containment basis is highly desirable.

It is concluded that the effective application of information technology in the form of an integrated loss acquisition database and management information system is vital to achieving the full potential of risk management in any organization. Some of the benefits of this approach are discussed together with a case history of a successful implementation.

It is concluded that the application of these techniques can give rise to a considerable improvement in profitability and should be a vital component of most organizations business strategy. Effective risk management supported by effective information systems can play a significant role in creating and sustaining competitive advantage.

1. INTRODUCTION

The management of risk in business today is a many faceted and complex task. Traditional approaches to risk management have focused on funding and financial issues rather than managing risk at source. As with maintenance, risk management has tended to concentrate on treating the symptoms rather than the cause. Events giving rise to large losses tend to originate from apparently insignificant occurrences with regard to wear and tear, maintenance and personnel which, with time, escalate to a point of giving rise to a major incident. The use of appropriate techniques to track small losses in a manner that enables management to analyze trends in such a way that proactive action can be taken to anticipate and prevent major losses and to identify the true cause of recurrent losses is vital to effective risk management that offers bottom line benefits.

In developing and implementing a risk management solution, it is important to recognize that a prime objective of the risk management function is to create a risk awareness culture in the organization in which there is an understanding of the adverse effects that risk exposure will have on the organization. As a consequence of this awareness and understanding, deliberate measures to minimize the potential impact on the organization should be implemented. A fundamental principle of risk management is a change in emphasis from an approach of contingency planning in the event of occurrence to proactive management directed at preventing risks from materializing. Risk management is therefore primarily a management function aimed at dealing mainly with uncertainties whilst taking cognizance of the consequences of pure risk and it's impact on business activities.

In designing a risk management solution, a number of tasks must be performed:

a.  The potential impact of hazards on the effective operation of the business must be considered.

b.  Steps necessary to achieve predefined objectives must be defined.

c.   Risk improvement programs to reduce the probability of occurrence of risks must be developed.

d.  Alternative strategies for controlling the consequences of risk and their impact on the organization must be developed.

e.  These strategies must be integrated into the general decision framework of the organization.

Management activities associated with this process will include risk identification, risk evaluation, risk control and risk monitoring. Risk control involves selecting and implementing the solution most appropriate to achieving the given objective while risk monitoring focuses on determining the outcomes in order to assess the validity of the decisions made. Risk management must take place at all levels in the organization.

In determining the cost of risk, in order to measure the effectiveness of a risk management programme, factors such as insurance premium costs, retention costs such as risk control expenditure, maintenance programmes, training costs, fire protection, security and administration costs must all be taken into account. An optimum risk management solution will maintain a balance between the cost of risk improvement and the level of risk financing with the objective of achieving lower levels of risk in conjunction with greatly reduced overall levels of expenditure as shown in figure 1.

In accomplishing these objectives, a means of acquiring and analyzing comprehensive and detailed loss statistics in order to determine the impact of risk management decisions and to identify problem areas requiring attention, is highly desirable. In fact, it is unlikely that the full long term benefits of a risk management program will be achieved unless the risk management program is supported by a comprehensive information system capable of recording all relevant loss information in a manner that supports comprehensive analysis and enquiry.


FIGURE 1 : DETERMINING THE COST OF RISK


2. DEFINITIONS

In discussing risk management in the context of designing and implementing a solution, the following terms are applicable (Valsamakis, Vivian, du Toit, "The Theory and Principles of Risk Management" 1992).

a.  Risk management

Risk management comprises a comprehensive range of activities for dealing with risks. As a science it identifies the methods that can be adopted to handle risks and to show the interdependence between the available alternatives. As a management function, it is used to plan, direct and coordinate activities in the pure risk area.

Figure 2 illustrates the relationships between business strategy, risk management and external influences.

Figure 3, based on the work of the Society of Risk Managers, illustrates the areas covered by risk management and the overall objectives of an organisation.

b.  Pure risk

Pure risk is a risk which results only in loss, damage, disruption, injury or death with no potential for gain, profit or other advantage.

c.   Risk control

Risk control comprises the provision of appropriate levels and standards of protection for people and assets to avoid, transfer, control of or acceptance of the pure risks which have been identified and evaluated.

d.  Risk financing

Risk financing involves the provision of funds for recovery from potential losses that do occur.

e.  Risk evaluation

Risk evaluation is the expression of identified pure risks in an organisation in quantitative / qualitative terms in order to gauge the potential severity and frequency of occurrence of these risks.

f.   Risk identification

Risk identification is the identification of the pure risks to which an organisation is or could be exposed.

Risk can be defined as the difference between what is expected and what is experienced. In figure 4 item (a) has a greater uncertainty than item (b) and there is therefore a greater probability that the outcome of item (a) will deviate significantly from the expected value with the resultant impact on operations and severity of loss.

g.  Pure risk improvement techniques

Pure risk improvement techniques are those techniques which are used to provide appropriate levels and standards of protection for people, assets and earnings. The four main techniques are as follows:

Avoidance - taking action so as not to incur the risk in the first instance.

Retention  - acceptance of the risk in its current make-up or character.

Transfer    - insurance, non-insurance or contractual transfer of the consequences of risk.

Control      - reducing the risk by controlling its frequency and its severity.

h.  Risk finance

Risk financing is intended to provide funds to assist the business to survive and recover from losses that do occur. The two main risk financing components are internal and external financing.


FIGURE 2 : THE RELATIONSHIPS BETWEEN BUSINESS STRATEGY,
RISK MANAGEMENT AND EXTERNAL INFLUENCES

FIGURE 3 : AREAS COVERED BY RISK MANAGEMENT AND THE

OVERALL OBJECTIVES OF AN ORGANISATION

FIGURE 4 : DEFINITION OF RISK


3. PHYSICAL FACTORS GIVING RISE TO EXCESSIVE RISK

Traditionally, the focus of risk management has been on the recording and reporting of claims as they relate to insurers. As a management tool, this did not really identify the real risk exposure of the organization. The tendency today is to focus on the overall cost of risk in an organization which is not only the insurance related cost of risk.

Physical factors that can exacerbate risk are diverse and include maintenance issues, health, environmental and other issues. A few aspects are discussed below.

The maintenance of complex plant, particularly in the production environment is often undertaken on a basis of maintaining the most visible items rather than on maintaining those items that have the greatest potential to give rise to losses or increase risk. For example, a decision to save money on the price of a valve or other low cost component can give rise to greatly increased down-time or even catastrophic failure of the plant. Most maintenance programs do not take account of these factors. An effective risk-focussed maintenance management system will focus on the loss implications of failure of a particular component and prioritize maintenance accordingly. This approach requires a different mind-set in the maintenance department and the provision of appropriate tools to enable the maintenance manager to allocate maintenance resources according to the loss implications of failure rather than traditional criteria. Sophisticated computerized information systems are required in order to accomplish this objective.

In practice, it is not uncommon for losses to result from apparently unrelated circumstances. A recent example involved a major transport operator where it was found that a disproportionate number of drivers suffered from diabetes and that their blood sugar levels were dropping in the afternoons as a result of inadequate diet to a level where serious accidents were more frequent than the industry norm. In another case, drivers were waking at 1 am in order to get to work on time and were losing concentration by mid-morning as a result of exhaustion. Many of these situations are never identified or are only identified in response to a decision from insurers to increase premiums because of poor claims history.

With appropriate information systems it is possible to monitor loss experience and identify unusual trends at an earlier stage. Under certain circumstances, it is also possible to identify relationships for more direct investigation thus reducing the time required for manual investigations.


4. INFORMATION NEEDS IN ORDER TO IDENTIFY TRENDS FOR PHYSICAL RISK CONTROL

Experience has shown that major incidents are normally preceded by a number of minor incidents over a period. Typically, such minor incidents do not attract attention and, in many cases, are not reported so that their occurrence is only highlighted during the investigation that follows the major incident. Appropriate use of a loss information recording system will enable these trends to be highlighted in terms of aggregate cost of risk, frequency of occurrence, etc. Such a system will also enable management to track the full scope of losses occurring and in some cases may highlight that the real cost of small losses exceeds the cost of the high profile losses which constitute the normal focus of attention.

Conventional loss reporting concentrates on the amount claimed from insurers rather than the hidden costs associated with the loss which includes down-time, management time, lost production, lost market opportunities, customer dissatisfaction, unremunerated overtime, staff dissatisfaction and other factors.

Compounding the above difficulties, it is frequently found in many organizations that the personnel responsible for risk control and risk improvement rarely communicate with the personnel responsible for making the financial decisions regarding insurance and self-insurance levels. In order to make strategic decisions with regard to the financial component of risk management, there is a clear need for organizations to restructure these functions resulting in a single line of responsibility for all risk related management as indicated in Figure 1. Tightly integrated risk management information is a vital component for achieving this objective.

In order to fully accomplish the objectives set out above, it is necessary to establish effective communication between the risk improvement and financial functions in order to ensure an integrated approach to risk management. The effectiveness of this communication can be greatly enhanced by having systems which will enable the full financial implications of past losses to be reported thus enabling the full implications of proposed risk management decisions to be accurately projected. This will, in turn, give rise to far better decisions with a long term impact on the profitability of the organization.

A prime requirement indicated by the above discussion is the need for a single integrated database of all risk related information in order to support a single basis of risk related decision making. In addition to information pertaining to incidents that occur, this database should include planned maintenance information, risk audit statistics, information about unaccounted losses, (those losses normally recorded elsewhere but which contribute to the cost of risk such as wear and tear) and other statistics normally recorded separately.

As an example, an organization involved in the introduction of ISO 9000 certification concluded that they were not being particularly effective in their maintenance programs. It was therefore decided to create a database of all major items such as boilers, pressure vessels, etc as well as all other equipment and to associate this database with a database of all relevant legislative requirements. Based on this database, maintenance of all plant and equipment was prioritised and scheduled and it was found that, whereas when the idea was first mooted, increased costs were anticipated, the overall cost of running the plant was reduced and plant efficiency was increased.


5. THE BENEFITS OF ESTABLISHING AN INTEGRATED LOSS DATABASE

The business case in favour of establishing an integrated loss database has been set out above, some of the benefits of such a database are listed below:

a. An integrated loss database will make it possible to introduce a holistic and consistent risk improvement program across the organization in order to enable a standardised approach to be adopted toward financial, and physical risk management.

b.  Accountability for losses and risk management can be effectively established by incorporation of an appropriate business model and business rules into the database in such a way that every item can be uniquely associated with a single responsible person who has final accountability. Consideration of these factors during the implementation of the system will frequently cause the organization to identify issues for which accountability has not been effectively defined.

c.   The true cost of risk, including hidden costs and high frequency, low value, unaccounted losses, can be established so that management can adopt a pro-active approach centred on reducing the total cost and not only the visible cost.

d.  The quality of pure risk management will be greatly improved and duplication of effort will be avoided.

e.  Early identification of adverse trends will minimize the probability of the occurrence of catastrophic loses and improve the ability of management to isolate those aspects of business operation that are most at risk of catastrophic loss. This in turn will enable informed decisions to be taken with regard to the need for disaster recovery and business continuity.

f.   Accurate centralized information will simplify risk management and reduce risk management costs for comparable results or, more importantly, give rise to a greatly improved return on the risk management investment.

g.  Accurate loss and risk management information, centrally available, will give rise to more effective decision making and enable management to see "the big picture". A well designed information system will also support distributed operation so that unit, plant, regional and corporate management will all have access to the components of the database of relevance to them. This will also enable management to benchmark similar business units across the organization in order to identify favourable and unfavourable trends in certain units. This has the potential to greatly improve the dissemination of information with regard to risk management practices that are delivering particularly noteworthy returns.

h. These facilities will also greatly enhance the ability of risk managers at all levels to adopt a coordinated approach to risk management.

i.    By providing effective summarization and drill down capability, it will be possible for management to focus on the key issues in risk management within the organization at any time.

j.   An effective risk management information system will also provide the tools necessary to ensure that insurance policy endorsements and limitations are constantly monitored thus greatly reducing the risk of policies being revoked due to non-disclosure or other considerations. A comprehensive risk management information system will include policy information at a level that allows full insurance policy management including aggregate management and other funding factors to be taken into account.

 

6. CONCEPTUAL REQUIREMENTS FOR THE IMPLEMENTATION OF AN EFFECTIVE RISK MANAGEMENT SYSTEM

Paton (1993) has discussed in detail the requirements for implementing a risk management system while Robertson (1992 1&2 and others) have discussed the implementation of computerized information systems. These publications and other work undertaken by the authors comprehensively document the approach necessary to undertake a project of this nature.

In summary, the requirements for the implementation of an effective risk management system include the following:

a.  Develop a risk exposure profile of the organization.

b.  Identify core business activities impacted by risk management.

c.   Analyze past losses and loss trends.

d.  Determine market factors influenced by risk exposure.

e. Integrate risk management with business strategy and introduce a program to make risk management part of the corporate culture.

f.   Address environmental issues as part of the cost of risk.

g.  Restructure the risk management and risk finance functions of the organization.

h. Implement a centralized loss information acquisition system and database and associated risk management information system.


7. CASE STUDY OF AN IMPLEMENTATION PROCESS

A major South African corporation which had previously self-insured all losses recently undertook the introduction of a comprehensive risk management program including the implementation of an integrated risk management information system addressing many of the aspects discussed in this paper. The information system implemented was the prototype of a more comprehensive system proposed for future development. The system was developed and implemented in late 1992 and has been successfully used since then to acquire comprehensive loss statistics and as an information base for introducing comprehensive risk management and risk financing practices throughout the organization.

The system is currently being used to process in excess of 10,000 loss incidents from five regions around the country using four operators. With the statistical base that has now been developed, the basis of risk funding between insured, self-insured and uninsured losses is being optimized and a comprehensive risk improvement program is being implemented. The system is also being used to monitor the progress of insurance claims submitted. It is estimated that a staff of about 12 would have been required to process the same information using conventional techniques without providing any of the management information that the computerized system makes available. Major enhancements to the system are envisaged based on experience to date with the objective of developing a commercial software system aimed at the corporate market.


8. CONCLUSION

A wide range of factors applicable to risk management with particular emphasis on the management of the physical factors contributing to risk have been discussed. The need to directly associate the financial implications of losses with the physical factors giving rise to risk is identified as is the need to record losses which are traditionally not accounted for. It is concluded that this can only be effectively accomplished using a comprehensive, integrated loss database and computerized risk management information system. Some of the benefits of this approach and conceptual considerations are addressed and brief case histories are presented.

It is concluded that the effective management of risk in organizations in a manner that will produce significant improvements in loss reduction will also give rise to significant improvements in operational efficiency and substantial overall profitability improvement. These benefits will only be achieved if an holistic approach to risk management and risk finance is adopted that takes account of hidden, as well as visible costs and is associated with a restructuring of the risk management and risk finance components into a single area of accountability. The application of leading edge information technology is a vital component of this solution but must be associated with practical and effective implementation within the organization.


FOOTNOTE

CRM Risk Control Consultants is a firm of specialist risk management consultants within the Price Forbes Group of Companies which specializes in providing a comprehensive risk management consulting service to clients. CRM Risk Control Consultants can be contacted on (011) 637-2148.

Differentiated Strategic Solutions (dS2) is a firm of independent business information system specialists concentrating on offering information systems consulting, software development services and strategic software products with particular emphasis on the fields of decision support and management information. They place particular emphasis on innovative solutions which enable clients to create and sustain competitive advantage and on the effective implementation of such solutions and have been involved with CRM in the development and implementation of the information system on which the case history is based. Through associates in The MaXus Group and other associated specialists they are able to provide a wide range of additional consulting and other services. Differentiated Strategic Solutions can be contacted on (011) 886-9863.

The contribution of our clients and associates without whom we would not have had the opportunity to evolve and develop these concepts is gratefully acknowledged.


REFERENCES

Robertson (1992(1)) Effective Implementation of Executive Information Systems. Paper presented at Executive Information Systems Conference, Johannesburg, March 1992.

Robertson (1992(2)) Enhancing Information System Effectiveness: The Human Element. Paper presented at Executive Information Systems Conference. Johannesburg, March 1992.

Robertson (1994(4)) A Practical Approach to Implementing Integrated Information Systems in Real Companies. Paper to be presented at SAICE IT Division Conference on Integrated Information Solutions in Engineering Practice, Johannesburg, October 1994.

Valsamakis, Vivian & du Toit (1992) The Theory and Principles of Risk Management. Butterworths.

22 to 23 June 1994

P18


Download the CRM Risk Control: Designing and Implementing an Integrated Risk Management System -- Article in Adobe pdf format


018 Designing and Implementing an Integrated Risk Management System that Effectively Minimizes your Exposure -- CRM Risk Control Case Study -- by Dr James A Robertson PrEng from James Robertson


Download Designing and Implementing an Integrated Risk Management System that Effectively Minimizes your Exposure -- Slides in Adobe pdf format

Download Designing and Implementing an Integrated Risk Management System that Effectively Minimizes your Exposure -- Paper in Adobe pdf format


The Benefits of Management Information Systems to the Professional Practice

SAICE 15th Annual Conference on Computers in Civil Engineering

By

Dr James A Robertson PrEng & Reg M Barry, Financial Director, V3 Consulting Engineers


SYNOPSIS

The advent of commercially available practice management software for the South African Consulting Engineering Industry some years ago, introduced the possibility of introducing far reaching, tailored, management information systems into the professional practice. This paper sets out to highlight some of the experiences and particularly the benefits derived from one such installation two years after implementation. The system comprises an integrated job costing, billing, debtors and creditors system linked to a comprehensive financial management system and an executive information system offering a wide range of management reports and graphical analysis.

Benefits experienced include the reliability and timeousness of the information, financial results are typically available within ten days of month end and year end financials within the same time frame at reduced audit cost and greater precision. A wide variety of reports are available and the organization can be viewed as a "Rubics Cube" of information in which the information can be grouped and examined in a wide variety of ways allowing project, client, profit center and other views of performance according to management's needs. Full activity based financial analysis and overhead distribution is supported eliminating the approximations typically made in assessing profit distribution and recognizing marketing and management contributions.

Senior management have had their workloads on mundane analysis greatly reduced while obtaining more accurate information faster. Information is also available at different levels of the organization at different levels of detail. Enquiries from a very summarized executive view to a very detailed transaction level analysis allow effective management by exception with drill down to specific problems. The variety of analyses possible offers great scope for effective management and directed marketing in a manner which should allow the company to create and sustain competitive advantage.

 

INTRODUCTION

The evolution of computer technology in the late eighties gave rise to a situation at V3 Consulting Engineers in 1989 where the existing projects system was becoming obsolete and no longer able to cope with the demands of the firm. Over the period 1989/90, the management of the firm undertook a number of preliminary reviews of commercially available software and subsequently commissioned a detailed study of the firm's requirements in which the relative strengths and weaknesses of the commercially available software packages was evaluated (Robertson 1990).

It was established that neither of the major packages available were ideally suited to the needs of the firm and further analysis was undertaken to establish in greater detail the scope of modifications required. Following negotiations with the vendors, a scope and budget for the required changes was agreed and a final decision taken as to which system to purchase. The selected system was a South African developed package already in use at a number of consulting engineering firms.

A period of software enhancement by the developers was followed by testing and pilot operation, the system was commissioned and ran live in the Cape Region of V3 in October 1991. Thereafter the system was installed in the Free State and Transvaal regions, running live from March 1992.

This paper outlines some of the experiences with the implementation with particular emphasis on the benefits derived from the use of the system.


SYSTEM OVERVIEW

The system selected comprised a number of major components:

Projects System

The projects system comprises a suite of programs including projects and personnel databases, salary and rates information. A company parameters module allows configuration of the system to model the organizational structure of the practice to take account of offices, departments and associated companies as well as to define the nature of the general ledger interface. A variety of set-up options allow further customization of the operation of the software.

The projects system provides full features for the entry and processing of time and expense information with comprehensive analysis of Work in Progress (WIP). WIP is maintained on an open item basis such that once captured, all items remain in the system until they are either recovered through billing to the client or written off. Full audit trails and analysis reports are available on the WIP. The project system includes a largely automated billing system.

The projects system also provides a wide range of facilities for structuring up to 5 levels of project detail and associated analysis together with activity codes and a variety of project budgeting and reporting options.

The projects system is integrated with debtors and creditors modules to allow full management of these accounting functions with project related reporting in debtors and both project and non-project expenses posted in the creditors program.

All financial components of the projects system are integrated on a batch basis with a commercial general ledger package.

Financial System

The financial system comprises a commercial general ledger package together with integrated cash book software. This is linked on a batch basis to a commercial salary package. The financial system has recently been extended by the acquisition of an integrated assets register package and barcode reader. The financial system replaced 24 column manual cash books.

The general ledger chart of accounts accommodates a comprehensive, fundamental analysis of all income statement and balance sheet items in a manner that is linked to the business model of the organization in terms of cost and profit centres including physical branch offices and administrative, technical and support departments. A hierarchical, structured coding scheme is employed in order to facilitate allocation of expenses on an activity basis, and to allow progressively more detail in enquiries. Associated with the chart of accounts, a variety of financial reports allow summary or detail reporting for the region, office or department as required, including summary and detail income statements, balance sheet, cash flow projections and ratio analysis.

The financial system is linked directly to the projects system in a manner that is designed to support activity based costing and allocation of income and expenses in a manner that permits clear definition of ownership of information with a view to achieving a high level of internal auditing and a resultant improvement in accuracy and reduction in audit delays.

National Consolidation

In the past year, procedures have been implemented to permit all financial results to be consolidated nationally at the detail level, thus permitting the extraction of a wide variety of detailed and summary analyses. Various controls on inter-region charges have also been implemented together with procedures for accumulation and distribution of corporate overheads.

Executive Information System

Recently a graphical Executive Information System (EIS) has been developed to operate on the underlying operational projects and financial systems. This EIS has been developed using a commercial, windows based tool and provides a high level of graphical summarization of certain key values in the projects and financial systems. Development is continuing.

The EIS system has been developed with the objective of enabling senior management to see key values summarized graphically in a meaningful way that allows them to rapidly identify potential problems and drill down to the detail in any way that they may consider necessary. Particular emphasis was placed on achieving a user interface that was intuitive for senior management and did not restrict enquiries on the basis of simplifying assumptions made during construction. The EIS also provides an interactive mechanism for overhead distribution on an activity basis, whereby all income and expenditure relating to non-production business units is distributed over the production units on an agreed basis. The model has been designed with a view to providing management with the means to examine the effect of alternative allocation formulae on the profitability of individual business units without altering the underlying data which has been allocated on a fundamental basis.

The ultimate objective set for the EIS is to support a "paperless board meeting" in which all relevant information is projected onto a screen in the board room so that managers can analyze and query information interactively and pro-actively thus facilitating management by exception rather than tabling large volumes of information.


OBJECTIVES FOR THE SYSTEM

A number of short term and long term strategic objectives were set for the system at the time that the initial investigation (Robertson 1990) was undertaken. Particular emphasis was placed on specifying the objectives and requirements for the system with the objective of meeting the long term strategic requirements of the firm with a view to avoiding the need to replace the system after a few years. Objectives set included:

- Provide tools to monitor and improve productivity and profitability.

- Enable profitability to be measured on a project, department and office basis using the cubic model proposed by Robertson.

- Assist the firm to offer the highest possible levels of service to it's clients.

- Ensure that charges for work were realistic and that work was performed effectively for the client.

- Provide comprehensive budgeting facilities for projects and financials.

- Assist in the evaluation of current and future directors with respect to appointment and promotion.

- Provide concise management summaries.

- Permit a global view of the practice.

- Permit detailed enquiry on all aspects of operations and job costing.

- Require minimum management time and manpower to operate system.

- System must be affordable.

All of these objectives have been met at the current time although costs have been greater than expected and would be handled differently if the project was undertaken today. Certain specific benefits are discussed in more detail in subsequent sections.


IMPLEMENTATION EXPERIENCE

The implementation was undertaken in a phased manner, as outlined previously. Problems were experienced in terms of availability of senior personnel in-house at certain times and in terms of commissioning the system in other regions using in-house personnel. This was undertaken with a view to cost containment but ultimately gave rise to increased costs associated with correction of problems experienced.

With hindsight, more use should have made of outside assistance in the implementation in the second and third regions. In-house staff were not experienced enough and the time they spent in other regions placed pressure on their own region's operation.

Time taken to achieve understanding and commitment to the new system by managers and staff at all levels proved to be greater than anticipated and required focused and firm action by top executives before all required information was provided by project leaders and other staff and proper use was made of management reports. Experience tends to support the widely reported view that a paradigm change of this magnitude requires between three and five years to become permanent in an organization.


BENEFITS OF THE SYSTEM

The projects system has now been in operation in the Cape Region of V3 for close to two years and in the rest of the country for eighteen months while the financial system has been in use country wide for eighteen months. As stated above, the objectives set three years ago have all been met. Specific benefits are discussed in the sections that follow:

Reliability and Timeousness of Information

Information is readily available, in many cases almost instantly. For example, analysis of time sheet data and other data captured to projects is available within two working days of the end of the month.

Full analysis of project performance for the month is available immediately data capture is completed including a wide variety of budget, costing and profitability reports. Up to date sales journals are available at any stage as are debtors and creditors age analyses. The EIS projects analysis can be made available within twenty four hours of month end or updated more frequently as appropriate.

Full financial statements including summary and detailed income statements, balance sheets and cash flow projections are generally available ten days after month end and include all closing and balancing adjustments for the period in question so that there is considerable confidence in the reliability of the information. The EIS financial analysis can be made available at the same time.

Because of the wide variety of combinations and groupings in which the information can be presented and the wide variety of controls built into the system, it is possible for all information to be reported in a manner which allows recipients to accept full ownership of specific sets of data. This facilitates verification and control and allows senior management to operate on the basis that, "if all subordinate managers have accepted the accuracy of their figures, the consolidated figures must be correct". This ensures a high degree of reliability and confidence in the information.

As a result of the detailed analysis contained in the general ledger, it is possible to operate the financial system in such a way that very little additional processing is required at year end over that required at month end. While some difficulties were encountered at the end of the first year of operations since not all procedures were fully in place, it was still possible to table the year end figures 17 days after the end of the year and they were signed off without qualifications by the auditors approximately five weeks later.

The Cubic Business Model

The business model referred to earlier allows the databases to be viewed as a multi-dimensional "Rubic's" cube which can be rotated and viewed in a wide variety of different ways. This permits the financial and production information to be grouped and summarized by office, department and region. Production (project) information can also be viewed by project leader, technical director, marketing director, client market segment, project discipline and client thus providing a fully market focused information capability. This information can then be used to focus marketing efforts and identify different marketing and management styles required for different market sectors as well as enabling management to evaluate the performance of individuals in terms of marketing and management contribution as well as production contribution.

In conjunction with these facilities, the activity based allocation of administrative overhead contribution by technical staff permits an accurate measurement of true profitability of individual business units or sub-units at a level which permits "level playing field" comparisons of business units. This eliminates the traditional problem of professional service organizations where the business units of those involved in management and marketing are penalized since only the production contribution is measured. Through this approach, inappropriate management decisions resulting from incorrect cost allocation can be avoided.

The system also supports attribution (allocation) of income from professional fees to the business unit employing the person doing the work. This permits the profitability of business units to be measured in terms of true, salary linked, revenue contribution as well as by the traditional method of project profitability and reduces the dependence on relatively arbitrary, rates based, costing approaches.

Senior Management Work Load and Effectiveness

Senior management have had their work load on mundane analysis greatly reduced as many of the analyses previously performed using spreadsheets have been incorporated into the system and are therefore available automatically with greatly reduced effort. Time spent resolving problems of mis-allocation and addressing queries with regard to year end has also been considerably reduced.

The multiple levels of summarization in conjunction with the high level of detail of the underlying data enable management to receive very summarized reports for routine management while affording them the capability to rapidly "drill down" to progressively more detail in order to answer queries.

Strategic Advantage

The wide variety of analyses available and the ready availability of information have freed management to be more effective while devoting less time to management and administration. At the same time, management have greatly improved scope to identify opportunities to improve operational effectiveness, increase delegation and improve profitability. They are also able to identify market related factors that can have a bearing on marketing strategy, product mix and other matters. These factors all enable the firm to offer innovative and competitive services in a competitive market. This is expected to assist the firm in creating and sustaining competitive advantage over the medium- to long- term as part of it's commitment to providing relevant, appropriate and cost effective services.


CONCLUSION

The components of a management information system (MIS) and associated financial and executive information systems have been summarized based on the experience of V3 Consulting Engineers. Certain experiences during implementation have been summarized and the objectives set for the system at the outset are reviewed. It is noted that these objectives have been met.

The benefits experienced by the firm are discussed with particular reference to issues such as timeousness and reliability of information, flexibility of analysis and control. It is noted that the work loads of senior management have been reduced while more accurate and detailed information is made available more rapidly. The ability to summarize the information in a great variety of ways while providing the ability to undertake enquiries at a very high level of detail when required, is noted as a further benefit.

It is concluded that the system has met most of the objectives set for it at the outset and that it is assisting the firm in it's objective of creating and maintaining competitive advantage through the provision of focused, appropriate and cost effective consulting engineering services.


REFERENCES

Robertson J A (1990) Report on Investigation Into Professional Practice Management Information Systems for Vorster, van der Westhuizen and Partners Unpublished report, October 1990.

September 1994

P11

Download the V3 Consulting Engineers: The Benefits of Management Information Systems to the Professional Practice -- Article in Adobe pdf format



011 The Benefits of Management Information Systems to the Professional Practice -- by Dr James A Robertson PrEng from James Robertson


Download The Benefits of Management Information Systems to the Professional Practice v 003 -- Slides in Adobe pdf format

Download The Benefits of Management Information Systems to the Professional Practice v 003 -- Original Paper in Adobe pdf format



Random Selection of Articles by Dr James Robertson

Dr James A Robertson PrEng The Business Information Systems Doctor

Business Systems NOT delivering?

Call the Business Systems Specialist

Dr. James Robinson

Dr James A Robertson -- has been involved in the effective application of Business Information Systems, including but NOT limited to ERP, since 1987 and in the profitable and effective use of computers in Business since 1981.

Drawing on a diversity of experience, including formal military training in Quick Attack techniques at the Regimental Commander level, Dr Robertson has developed highly effective methods of investigating any sub-optimal Business Information Systems situation -- be it an established system or a stalled project or any other source of Executive frustration -- quickly and concisely diagnosing the root cause of the problem and prescribing concise practical actions that Business Executives can effectively act on see the Pulse Measurement page and also the Sample Reports page for redacted real reports.

He has also developed highly effective methods of strategically enriching systems to unlock the full potential of existing investments, see the Precision Configuration page and couples this to architecting small pieces of clever software that harness the full potential of your investment, see the Software page.

If you are having problems with your systems, your project or your IT Department, call The Business Systems Specialist
James@James-A-Robertson-and-Associates.com

Business System Failure is RIFE -- we offer insight into why this happens AND WHAT is required to prevent it.

Failure is at epidemic levels with massive damage done to client companies -- if you are NOT aware of the extent of the problem please visit the About Failure page for a catalog of major failures running to billions of Pounds and Dollars.

All evidence indicates that the established players do NOT know how to deliver stable, reliable high value solutions that WORK.

There HAS to be a better way!

This website provides information relating to that way with a large collection of white papers, presentations, standards documents, etc that you can use to start bringing the situation under control

We also offer high level advisory services with regard to the application of the principles advocated on this website

We offer an ENGINEERING APPROACH to addressing these issues

Click here to read more about the Engineering Approach

By Engineering I mean the formal, structured, highly disciplined, highly systematic, highly practical approach that consistently delivers results in ALL areas of human endeavor where formally trained and certified engineers are the ONLY practitioners permitted to operate -- think large buildings, factories, motor vehicles, aircraft -- highly complex systems that work at a level that we take it for granted that they WILL work and where failure is all but unthinkable and, when it happens, attracts immediate public attention and rigorous investigation directed at ensuring that such failures are prevented in the future -- in fact, everything that the management consulting industry that implements complex software systems is NOT

This approach is discussed further on the Engineering Approach page.

Book -- The Critical Factors for Information Technology Investment Success

In 2003 I undertook an in-depth analysis of all the information and experience that I had gathered with regard to the factors giving rise to Business Information System failure including ERP and general IT and classified this information into a number of categories including "The Factors Causing Failure" and "The Critical Factors for Success" based on this I developed a two day Course "The Critical Factors for Information Technology Investment Success" which is still offered today.

Based on this I wrote the book of the same name, which is available in electronic form here for download:

Subscribe to our StratNews newsletter

Click here to send us an email subscribing to our free newsletter -- all articles posted by James Robertson will be emailed to you


Random Selection of Articles by Dr James Robertson

Std 017 Procurement: 08b System Procurement Gut Feel Factors

A rating sheet that takes account of the softer, gut feel issues in adjudicating the tender, this is in addition to the highly structured and very formal Adjudication Schedule that I provide and the formal Tender presentation standards that are laid down in the Request for Proposal master document
Cnf 081 Insights of Knowledge Management in a Global Recession

A discussion of the importance of Precision Configuration as a vital component of unlocking the full value of business information system investments as part of a Knowledge Management culture
Cnf 068 Discovery -- An Essential Element of SOA Implementation

The importance of effective discovery and the issues that arise from inaccurate discovery including understanding the importance of communication in the first hour of engagement

Connect with James Robertson on LinkedIn

James has a very detailed profile on LinkedIn should you require further information about him.

You can also connect with him on LinkedIn at http://www.linkedin.com/in/DrJamesARobertsonERPDoctor

James has an open networking profile -- click on "Connect" and use email address James@LinkedIn-at-JARA.com.

Contact Us

You can contact us on

Email: James@James-A-Robertson-and-Associates.com

LinkedIn at http://www.linkedin.com/in/drjamesarobertsonerpdoctor

Facebook at https://www.facebook.com/james.a.robertson.393

Mobile: +44 (0) 776-862-2875

Landline: +44 (0) 207-059-0007

Fax: +44 (0) 844 774 4580

Articles by James A Robertson and Associates

There is a large body of white papers, articles and other content produced by Dr James Robertson available on this website

Please click here to visit the detailed listing of articles

ArticleTagCloud for Articles Published by James A Robertson and Associates

7 steps to FIX your ERP      80:20 regarding software replacement      aborted projects      abstract      abstractness      accounting      actionable      adjudication      Advantage Data Transformer      advisory      agreement      all possible classifications      all reports      all software elements required      all spreadsheets      all tasks required to execute the project      Alpha Omega      analysis of data      analytics      animation      answers to the questions we have NOT yet thought to ask      Armscor      arrogant ignorance      art of strategic business information system project leadership      ASCO      attendance register      attorney      audit      audit cost reduction      bankrupt organizations      basis for achieving alignment      basis of payment      basis of pricing      better way      bid adjudication      bid adjudication score sheet      bid compliance      bid compliance checklist      bill of materials      bill of services      BIS      BIS failure      BIS success      boots in the mud      BPM      BPM dangerous      BPM distracting      BPM ineffective      brainstorming      break it until it does NOT break anymore      break it until it will NOT break any more      budget      budgeting      business engagement      business executives      business improvement      business information system      business information system failure      business information system success      business information system taxonomies      business information systems      business information systems procurement      business information systems projects      business integration      business intelligence      business intelligence models      business knowledge and experience      business participation      business process      business process mapping      business requirements focused      business requirements specification      business simulation laboratory      business systems      business systems laboratory      business understanding      by the book      care      case studies      case study      CEO      CEO -- project leader communication      CEO as custodian      CEO definite views      certificates      challenges      challenging presentations      change facilitation      change for strategic reasons      chart of accounts      classification schemes      clever software      client changing scope      client compact      clinical codes      coaching      Cobol      COBOL CAN be retained      Cobol still viable      code schemes      coding conventions and standards      cognitive span      collapse      communication      competitive advantage      competitive advantage through precision configuration      competitiveness      compiler      complexity      compliance      compliance checklist      comprehensive testing      Compuware      conference speaking      conferences      confidentiality      configuration      consultant NOT delivering what required      contract      contract certificates      contract law      contracting      contractors      corporate planning      cost      cost-quality-time      CPT 4      CPT4      critical factors      critical factors for IT investment success      critical factors for success      critical factors for technology success      critical human foundation      critical issues      critical issues analysis      critical requirements      CRM Risk Control      cubic business model      custom development      custom software      customer focused      data      data content      data engineering      data entities      data warehouse      DB2      definitions      design against failure      design and development      design for success      determination of strategic essence      determining strategy      diagnostic code      diamonds in the dust      differentiated      differentiation      diffusion of innovations      discovery      dislike of failure      dispute resolution      do NOT change systems because of alleged software redundancy      do things competitors could NOT do      document pack      Dr James A Robertson      Dr James A Robertson PrEng      dramatic benefits      dramatically improved strategic management information      driver of success      Dunning-Kruger effect      ease of use      economic collapse      economics      effective communication      effectiveness      efficiencies      efficiency      efficient filing of emails      eliminate light bidders      email      engineer against failure      engineered data      engineering      engineering approach      engineering approach to strategy      engineering failure      engineering laboratory      engineering services      engineering solution design      engineering techniques      enhance differentiators      enhance the differentiators      enhancing the value of your present investment      ensuring project success      enterprise resource planning      ERP      ERP configuration      ERP failure      ERP procurement      ERP success      ERP taxonomies      ERP value      essence IS different      essence of business      essence of the business and how it thrives      ethics      examples      exceptionally bad code design      executive briefing      executive briefings      executive custody      executive decision support      executive engagement      executive forum      executive frustration      expose hidden agendas      facilitation      factors causing failure      factors causing IT investment failure      factors causing technology failure      factors to manage for success      failure      failure to address soft issues      fashion      file table of contents      Financial Information System      financial information systems      financial management      fixing your ERP      focus for projects      folder design      foundation for delivery      full training      functional entities      future      Gantt Chart      gap analysis      general ledger      George Paton      go-live      go-live certificate      governance      governance = care      governance failure      group consolidation      Group Consolidation Chart of Accounts      growth      gut feel factors      hand holding      harshest judge of governance      hate failure      head count reduction      health management software      hierarchies      high level requirements      high road      high value      high value implementations      high value solutions      high value systems implementation      highly effective chart of accounts      holistic view of solution      how do you achieve executive custody      how the organization differentiates itself      how to      how to do it      huge opportunity      human foundation      hype      Hyperion      IBIS      ICD 10      ICD10      importance of executive custody      improved management information      in-box rules      incremental enhancement of existing systems      ineffectiveness      inefficiency      information required from third party suppliers      information technology      information technology failure      Information Technology Strategy      information technology success      Informix      in-house courses      innovative software solutions      innovator      inside head of CEO      insightful      instructions      intangible      integrated business information system      integrated view of business      integrity      intelligent data      interactive training material      interview      invitation to bid      isolated CEO = explosion      IT      IT and strategy      IT Audit      IT failure      IT governance      IT lies      IT management      IT mythology      IT non-performance      IT people who lie      IT personnel socialization      IT procurement      IT projects that fail      IT strategy      IT systems      IT systems procurement      IT the harshest judge of governance      James Robertson      Jof Nelson      key performance indicators      Kirsten Speer      knowledge management      laboratory      lack of an engineering approach      lack of precision configuration      lack of strategic alignment      lawyer      leadership      legal agreement      legislation      lies      list of required software      listen carefully      litigation      logical entities      loss information      low road      loyalty      MacDonald      maintain code schemes      maintenance      maintenance management      Malcolm McDonald      management      management information      managing contractors      manual      marketing hype      master data      master data classifications      master test data      mature facilitation      mature facilitator      measurable      measures of alignment      mentoring      Microsoft Outlook      misrepresentation      missing link      mistique      morals      Munich      mystique      mythology      new future state      New South Africa      no drill down      non-disclosure      NOT classic project management      obsolete is a fashion statement      obsolete software      old software IS viable      once software works it always works      on-line seminars      opportunities      opportunity to turn the economy around      organizing Microsoft Outlook      orientation of IT staff      own business experience      passion to enable clients to thrive      people are part of the system      personality matrix      planning      platform for a tough contract      precisio      precision      precision configuration      precision configuration advisory      precision configuration leadership      precision data      precision taxonomies      Predictive Index      preparatory steps      prescribed table of contents      presentation technique      presentations      preventing failure      preventing falure      preventing project failure      pricing      principles      problem statement      procedure code      process      processor ignorant of language      procurement      procurement timeline      professional speaker      Professional Speakers Association of Southern Africa      profitability      programming languages are for the programmer      project facilitation      project leader      project leader -- CEO communication      project leadership      project management      project management IT project management      projects      prove it works      PSASA      psychology      psychometrics      public conferences      public presentations      public speaking      Pulse Measurement      quality      REAL issues in Business Information Systems      REAL value      recognizing failure      redaction      reduced audit costs      reduced head count      reference documents      Reg Barry      regulatory body      relationship Almighty      relationship orientated      remediation of existing systems      Rennies Group      reports      reports not reliable      request for proposal      requirements specification      results orientated      RFP      right things      rigorous process      rigorous strategic planning      risk management      Robert Priebatsch      robust business information systems procurement      robust business systems procurement      robust contracts      robust procurement      robust solutions      SAICE      SAP ABAP is similar to COBOL      scheduling procurement      scientific professional      score sheet      screen design      seminars      SEPT      service orientated      Service Orientated Architecture      simple techniques to enhance business information systems value      simulation      sloppy configuration      SOA      socialization      software      software assets      software design      software does NOT wear out      software is instructions for the bricklayer      software schedule      software specification      software specification standards      solution experience      solution knowledge      South Africa      South African Institution of Civil Engineering      speaking      Spirit Led      standards      strategic      strategic advisory      strategic alignment      strategic analysis      strategic analysis and design      strategic business improvement      strategic custom development      strategic definition      strategic discovery      strategic driver      strategic driving force      strategic engineered precision configuration      strategic engineered precision taxonomies      strategic essence      strategic financial information      strategic gap analysis      strategic governance      strategic information      strategic management      strategic management information      strategic plan      strategic planning      strategic project leader      strategic snapshots      strategic software      strategic solution architect advisory      strategic solution architect leadership      strategic solution architecture      strategically designed chart of accounts      strategy      strategy defined      strategy focused planning      Strategy Snapshot Toolset      StratGap      StratSnap      strengthen differentiators      structured analysis      structured chart of accounts      substantial management information      succeed by engineering against failure      success      successful deployment      survive      system knowledge and experience      table of contents      tailored presentations      take notes      taxonomies      taxonomy      taxonomy software      technology      technology failure      technology issues      technology management      tender document pack      tender pack      tender pack table of contents      test data      testing      The Critical Factors for Information Technology Investment Success      the Critical Factors for Success      the essence of the business      the essence of the business and how it thrives      the essence of the organization and how it thrives      the factors causing failure      the first hour      The REAL Issues in Business Information System success      things right      third party suppliers      third world countries      thrive      time      tipping point      tough certificates      tough contract management      tough contracts      tough procurement      tough terms      training      training material      treatment code      understanding of data      understanding the engineering approach      Uniface      unlocking value      use different languages for new components      V3 Consulting Engineers      validation data      value      versus process      video      webinar      webinars      weighted factors      what is executive custody      what is strategy      what is the essence of this organization and how does it thrive      what to do      where is IT going      why executive custody is required      why the organization exists and how it thrives      why your business information system is NOT delivering and HOW to FIX it      why your ERP is NOT delivering and how to fix it      workflow      writer     

Search Articles

Table of Contents

Home

About Dr James A Robertson PrEng -- The Business Systems Doctor -- and Other Topics

Catalogue of Major Business Information System Failures

About the Engineering Approach

James Robertson's Value Add

Attributes of a HIGH VALUE solution

Recognizing Business System Failure

The Critical Human Foundation

Old Software IS Viable

From South Africa

Competencies of Dr James A Robertson PrEng

About Professor Malcolm McDonald

Table of Contents

About my relationship with the Almighty Creator, Yah the Eternally Self-Existing

Comments relating to the Business Systems Industry and other topics

Testimonials and other positive material regarding James Robertson

Reference Articles

List of Articles

Article Catalogue

Achieving High Value Business Information System outcomes

Executive Custody -- What is it and HOW do you get it?

The REAL Issues in Integrated Business Information System Success

Part 1: Introduction

Part 2 -- Mythology and Lack of Executive Custody

Part 3 – Strategic Alignment and Precision Configuration

Why your ERP is NOT delivering and HOW to FIX it

IT Project Management

Pulse Measurement

CEO Anthony Lee Comments on his experience of the Pulse Measurement

No Charge Guarantee on the Pulse Measurement Service

Examples of Pulse Measurement Outcomes

Critical questions regarding the Pulse Measurement™

The Pulse Measurement Workflow

The Critical Factors for Business System (ERP+) Investment Success in the Pulse Measurement

Indicative Pulse Measurement Durations

What is a JAR&A Pulse Measurement?

Survival of the fittest – why it makes sense to measure the pulse of your business

Examples of Pulse Measurement Outcomes over 24 years

Sample Pulse Measurement Reports

Strategy

Strategic Essence: The Missing Link in Business Information Systems

Strategic Essence: Overview

Strategic Essence: Part 1 -- Strategy Defined

Strategic Essence: Part 2 -- Differentiation

Strategic Essence: Part 3 -- The Essence IS Different

Strategic Essence: Part 4 -- The Essence should be the Point of Departure

Strategic Essence: Part 5 -- Discovering Strategic Essence

Strategy -- the Essence of the Business: What is it and how do you develop actionable strategic plans?

Simple Steps to Increase the Strategic Value of your ERP Investment

Free Strategic Snapshot Toolset and Manual

A strategy focused planning system beyond traditional budgeting

Tough IT and ERP Procurement and Contracting that Works

Robust Business Systems Procurement

Part 1 -- Introduction

Part 2 -- Bill of Services, Laboratory, Go-live Certificate, etc

Part 3 -- Executive Engagement, Bid Compliance, Adjudication and other matters

Procurement Documents

Guidance and Advisory Services

The Art of Project Leadership

Why Regular Communication with the CEO is Vital

The Business Simulation Laboratory

Precision Configuration and Strategic Business Information Architecture

Precision Configuration based on Strategic Engineered Precision Taxonomies

The JAR&A Cubic Business Model

Highly Structured Strategic Chart of Accounts -- a Vital Element of your Corporate Information Arsenal

The Product Catalogue -- an Essential Element of any Precision Configuration

Attributes -- answers to the questions you have NOT yet thought to ask

Case Studies of Notably Successful Projects with high value Precision Configuration

092 Doing things differently and better -- ASCO Case Study 2-- BPM Summit 2013

088 Strategic ERP Invesment -- ASCO Case Study -- Service Management Conference and Exhibition Africa

026 Information Architecture and Design of FIS for Rennies Group -- Financial Information Systems Conf

018 CRM Risk Control: Designing and Implementing an Integrated Risk Mgmt Sys -- Integrated Risk Mgmt Conf

011 V3 Consulting Eng: Benefits of MIS to Professional Practice -- SAICE 15th Ann Conf on Computers in Civil Eng

Strategically Enriching your Business Information Systems

Part 1 -- Introduction

Part 2 -- Principles of Data Engineering

Part 3 -- Steps in applying these recommendations

Simple Steps to increase the strategic information value yield from your Business Systems Investment

The Full JAR&A Taxonomy Manual

Part 1: Introduction, Problem Statement, Definitions and Examples

Part 2: Why Use JAR&A, Required Knowledge and Experience, Cubic Business Model and Chart of Accounts and Taxonomy Software

Part 3: How to do it, Case Studies and White Papers and other References

Example General Ledger Manual

Business Process -- Irrelevant, Distracting and Dangerous

The RIGHT Approach

Custom Strategic Software Design and Oversight of Construction

Standards for Custom Software Specification

What IS Software?

IT Effectiveness

Organizing Outlook

Critical Factors for I.T. Success

A Moral and Ethical Dilemma -- Systems that Fail

Case Studies examining Business Information System failures

The BBC Digital Media Initiative Debacle

The Bridgestone -- IBM Conflict

Speaking and Training

Showcase of Conference Presentations

Most Viewed Presentations

Briefings and Seminars

Why your ERP/BIS is NOT delivering and HOW to FIX it

ERP and IT Procurement that Delivers Results

The Critical Factors for IT and ERP Investment Success

Other Seminars

Conferences and Public Presentations

Conferences 80 to 99 -- 2009 to Present

Conferences 60 to 79 -- 2005 to 2009

Conferences 40 to 59 -- 1996 to 2005

Conferences 20 to 39 -- 1994 to 1996

Conferences 01 to 19 -- 1989 to 1994

On-Line Seminars (Webinars)

Webinar on Preparing and Presenting Webinars

Contacting James A Robertson and Associates Limited